Before calculating the cost of finishing a townhouse, you should remember about its features and differences from repairs in typical apartments of multi-storey buildings.
Townhouses are larger than apartments. Does this mean that the cost of repairs will become "unbearable"? Indeed, when recalculating prices for square meters the amount sometimes turns out to be significant, however, large discounts are provided to customers of construction services in bulk, which can be considered the owners of townhouses. Thus, the owners of the premises of the new standard are the winners.
A townhouse as an object of repair differs from an apartment in high-rise building not only area. In particular, in such housing there are elements and structures that are not found in apartments:
Thus, in the list repair work The budget will include the following main items:
At the same time, a townhouse differs from a private household, first of all, by the presence of common walls with neighbors, so soundproofing of this wall may be required for maximum comfort.
For a competent repair of a townhouse, a design project is needed. Its presence provides a number of advantages:
After the design of the project is developed, the list of works and their scope are more accurately determined:
Are you the owner of a newfangled townhouse and want to make it such a renovation that would correspond to the architecture of this house and at the same time would be comfortable, convenient for living and have a unique design? The company "RedRem" is ready to repair a turnkey townhouse.
Renovation of townhouse apartments is not an easy event, since houses of this type have a vertical type of room arrangement. This means that the house will have a rather complicated system for laying communications, as well as a staircase that needs to be made as safe and aesthetic as possible. RedRem specialists have sufficient work experience and all the necessary tools in their arsenal in order to make turnkey repairs of townhouses qualitatively and reliably.
When ordering a townhouse repair service with materials, each client receives gifts from the company.
The first is a design project. The interior design is the most important stage in the repair. It allows you to plan repairs and decoration to the smallest detail. Design, layout and zoning are worked out based on your requirements and wishes. On the basis of the project, schemes for laying communications will be developed, as well as a detailed estimate with prices for materials and work.
The second gift is the insurance of your townhouse in Sberbank. The term of insurance is 1 year, the face value of the certificate is 2 million rubles.
Thirdly, we will organize a complete cleaning of your home after renovation with the help of a professional cleaning company.
The repair of the townhouse will be carried out by masters of a narrow profile. A team of at least 10 people. Each specialist is responsible for his area of work. That is why all work from rough finish to decor will be performed with a guarantee of the highest quality. The head of the facility will monitor the progress of the work, who, if necessary, will answer your questions and provide a photo report at the end of each week.
Renovation of townhouses from RedRem is a high-class finish and an exclusive project. Upon completion of the work, you will receive an ideal home for life that meets all modern standards of beauty and safety.
For all work within the framework of any service, we provide a guarantee (from 12 months) and service maintenance of all mounted engineering networks. Do you value quality and reasonable cost? Then make the right choice, leave a request for a free measurement and a preliminary calculation of the estimate on our website. Within 5 minutes, our specialist will discuss the terms of cooperation with you.
" width="266" alt="(!LANG:Townhouse renovation" style="padding: 0 0 10px 10px;float:right"> !}Deciding who is primarily responsible for townhouse renovation when you find problems is your first step to planning necessary work. Most city homes are located in communities with a homeowners association. Chances are you're paying a monthly fee for an HOA and now you're hoping to get some of that investment back. townhouse renovations.
However, it's important to read the fine print in the contract - you may be primarily responsible for repairs to your townhouse roof or facade walls. And you can be held liable if the damage extends to your neighbor's property, i.e. if your neighbor is having problems because you didn't fix a roof leak or a cracked foundation in time.
Although each HOA agreement is different, the means of monthly payment utilities usually cover most of the upkeep of an apartment. When you buy a townhouse, you are essentially buying a single-family home, minus the surrounding walls and roof, as you now own the piece of land on which your dwelling is located. When you buy an apartment, you only have the interior space, not the building, and not the land.
The condominium and townhouse HOA fee usually pays for the owner's liability insurance, covering everything that a normal homeowner's policy has. The owners of a part of the house provide regular payments to cover the operating costs plus some part for repairs and troubleshooting that affect the general condition of the building. If the roof begins to leak or the thermal insulation, the heating system (and it is often autonomous), repairs are the responsibility of the HOA.
In some HOAs, funds are spent only on maintenance costs. common property, and internal repairs of real estate - your property, you make from your own funds. However, your townhouse's association may cover disaster-related repairs to either the general façade, including the installation of identical windows and front doors. They may also have a portion of the fees set aside in a reserve capital account allocated to general property repairs, such as improving heat resistance, antiseptic treatment, etc.
Before buying a townhouse, read the specific terms of the agreement regarding the repair. If the rules of the owners' association provide for general maintenance and upkeep, it will also include capital and partial renovation in the projected budget. There should be a clear schedule for replacing or refurbishing parts of the building and include a specific cost analysis. If an association is only responsible for maintenance and troubleshooting, it may happen that overhaul will have to pay additional fees. It is in your best interest to attend all HOA meetings and understand the scope of the work and services you are paying for in order to avoid financial problems in the future.
If the responsibility for any aspect of a townhouse renovation is not entirely up to you, be sure to accurately manage your own long-term budget when it comes to major interventions. You have the right to fully control the quality of work and the materials used, to express your suggestions on the account of which organization or private contractor to entrust the work.
On our resource for construction and repair, you will also find many useful and relevant tips for improving your home.
Ceiling primer for 1 time | m2 | 35 |
Gluing the ceiling with reinforcing mesh | m2 | 100 |
Leveling the ceiling up to 3 cm (plaster) | m2 | 300 |
Ceiling plastering and sanding | m2 | 140 |
Gluing and putty of ceiling rust (no guarantee) | p.m. | 150 |
Pasting the ceiling with wallpaper (non-woven, vinyl) | m2 | 120 |
Pasting the ceiling with wallpaper (paper wallpaper) | m2 | 160 |
Glass ceiling cladding | m2 | 160 |
Ceiling painting 2 times | m2 | 182 |
Pasting the ceiling with textile wallpaper | m2 | 300 |
Ceiling cladding with cork panels | m2 | 280 |
Ceiling cladding with styrofoam panels | m2 | 130 |
Ceiling plinth installation | p.m. | 120 |
Ceiling skirting board painting 2 times | p.m. | 120 |
Ceiling installation "Armstrong" | m2 | 245 |
Installation of the ceiling "Armstrong" mirror | m2 | 280 |
Installation of a ceiling made of aluminum rails on a metal frame | m2 | 525 |
Clapboard ceiling lining | m2 | 330 |
Installation of a wooden corner on the ceiling | p.m. | 100 |
Lacquering the ceiling from the lining for 2 times with polishing | m2 | 200 |
Ceiling installation (GKL) 1 level | m2 | 400 |
Ceiling installation (gypsum board) level 2 | m2 | 500 |
Ceiling installation (gypsum plasterboard) level 3 or more | m2 | 600 |
Installation of heat and sound insulation on the ceiling | m2 | 100 |
The device of the box from the GKL on the metal frame ceiling | p.m. | 430 |
Priming of curvilinear sidewalls for 1 time | p.m. | 35 |
Puttying and sanding curved sidewalls | l.m. | 245 |
Wallpapering curvilinear sidewalls | p.m. | 120 |
Coloring curvilinear sidewalls 2 times | p.m. | 120 |
Installation of a perforated corner on curved surfaces | p.m. | 100 |
Installation of a perforated corner on straight surfaces | p.m. | 100 |
Ceiling baguette putty | p.m. | 60 |
Polyurethane baguette primer up to 150mm wide. | p.m. | 35 |
Coloring of a polyurethane baguette up to 150 mm wide. | p.m. | 120 |
Installation of a decorative element made of polyurethane. for lamps (+ putty and sanding) | PCS. | 300 |
Polyurethane baguette primer for lamps | PCS. | 35 |
Painting a polyurethane baguette for lamps | PCS. | 120 |
Installation of plastic panels with the manufacture of the frame | m2 | 330 |
Installation of slatted ceilings | m2 | 525 |
Installation of stucco under the chandelier | PCS. | from 350 |
Stretch ceilings glossy from: | 1m2 | 525 rub |
Matte stretch ceilings from: | 1m2 | 350 rub |
Stretch ceilings Starry sky | 1m2 | treaty |
Wall primer for 1 time | m2 | 30 |
Wall treatment with concrete contact | m2 | 45 |
Plaster walls of a curved plane | m2 | 350 |
Wall gluing with reinforcing mesh | m2 | 120 |
Plaster (wall leveling) | m2 | 330 |
Installation of perforated corner | p.m. | 70 |
Wall putty (under wallpaper in two layers) | m2 | 175 |
wall sanding | m2 | 70 |
Wall painting VA for 2 times | m2 | 120 |
Wallpapering walls (paper, vinyl) | m2 | 160 |
Wall papering (non-woven) | m2 | 120 |
Wallpapering walls for painting | m2 | 120 |
Wallpapering the walls in two levels | m2 | 120 |
Pasting the walls with a wallpaper border | p.m. | 70 |
Pasting walls with textile wallpaper | m2 | from 245 |
Wall cladding with cork panels | m2 | 245 |
Partition device from GKL | m2 | from 280 |
The device of a partition from GKL in 2 layers | m2 | from 350 |
Laying partitions from gypsum blocks, foam blocks | m2 | 500 |
Masonry of curved partitions from gypsum blocks, foam blocks | m2 | negotiable |
Installation of sound and heat insulation | m2 | 70 |
Masonry partitions in 1/2 brick | m2 | 420 |
Masonry partitions in brick | m3 | 210 |
Glass block partition walls | m2 | negotiable |
Installation of GKL (GVL) on walls with knauff glue | m2 | 260 |
Installation of a false wall from gypsum plasterboard on a metal frame | m2 | 245 |
Installation of a PVC false wall on a metal frame | m2 | 280 |
Clapboard wall cladding | m2 | from 210 |
Antiseptic lining | m2 | 40 |
2x varnish treatment with sanding | m2 | 120 |
Sheathing of PVC walls, MDF on the crate | m2 | 140 |
Wall cladding with cafe tiles | m2 | from 490 |
Wall cladding with cafe tiles diagonally | m2 | from 595 |
Facing a kitchen apron with a cafe tile diagonally | m2 | from 595 |
Grouting tiles | m2 | 70 |
Installation of a ceramic border | p.m. | 105 |
Cut tiles at 45 degrees | p.m. | 210 |
Mosaic wall cladding | m2 | from 630 |
Wall cladding with tiles measuring 10 * 10 | m2 | from 525 |
Installation of a plastic corner (external, internal) | p.m. | 100 |
Installation of a metal corner on a tile | p.m. | 105 |
Wall cladding with natural stone | m2 | 770 |
Wall cladding with decorative stone | m2 | 770 |
Applying Venetian plaster | m2 | negotiable |
Application of decorative plaster | m2 | from 420 |
The device of the box from the GKL on the metal frame | p.m. | 490 |
MSL box device | p.m. | 490 |
Box primer for 1 time | p.m. | 30 |
Tiled box cladding | p.m. | 490 |
Putty and sanding of the box | p.m. | 200 |
Puttying and sanding the box for painting | p.m. | 200 |
Wallpapering the box | p.m. | 120 |
Coloring the box for 2 times | p.m. | 124 |
Sheathing slopes clapboard | p.m. | 375 |
Installation of PVC slopes | p.m. | 280 |
Installation of slopes from GKL | p.m. | 280 |
Slope plaster | p.m. | 280 |
Arched slope plastering | p.m. | 375 |
Priming of slopes for 1 time | p.m. | 30 |
Putty and sanding slopes | p.m. | 200 |
Puttying and sanding slopes for painting | p.m. | 200 |
Wallpapering slopes | p.m. | 120 |
Application of textured plaster | m2 | from 420 |
Coloring of slopes for 2 times | p.m. | 120 |
Facing slopes with tiles | p.m. | 525 |
Installation of wooden corners | p.m. | 100 |
Lacquering wooden corners | p.m. | 120 |
Installation of a plastic corner | p.m. | 70 |
Mounting the mirror on the wall (with glue) | m2 | 420 |
Corner Alignment | p.m. | 140 |
Alignment, junction (wall-floor, ceiling) | p.m. | 154 |
Painting of metal structures | m2 | 140 |
Priming of metal structures | m2 | 40 |
Waterproofing walls with mixtures | m2 | 140 |
Sealing seams with serpyanka and uniflot | p.m. | 35 |
The device of walls from MDF panels | m2 | 350 |
The device of walls from plastic panels | m2 | 315 |
Front masonry in 1/2 brick | m2 | 630 |
Device niches in brickwork | m2 | 1400 |
Niches in concrete | m2 | negotiable |
Column installation (p / y) | m.p. | 210 |
Putty, column painting (p / y) | m.s. | 175 |
Wall cladding with imitation timber | m2 | 330 |
Priming walls from a bar with a tinted antiseptic for wood | m2 | 140 |
Wall painting from VA timber | m2 | 154 |
Wall notching | PCS. | 65 |
Floor primer for 1 time | 1m2 | 30 rub |
Dry mix waterproofing device | 1m2 | 190 rub |
Tie device up to 3 cm | 1m2 | 265 rub |
Screed reinforcement | 1m2 | 70 rub |
Finish floor leveling | 1m2 | 175 rub |
Laying tiles on the floor | 1m2 | 560 rub |
Laying ceramic plinth, border | p.m. | 105 rub |
Mosaic masonry | 1m2 | 1000 rub |
Laying tiles on the floor diagonally | 1m2 | 665 rubles |
Laying pvc floor tiles | 1m2 | 210 rub |
Floor cladding with natural stone | 1m2 | 700 rub |
Facing steps with ceramic tiles | p.m. | 400 rub |
hardboard flooring | 1m2 | 105 rub |
Broach of the old floor with self-tapping screws | 1m2 | 70 rub |
Laying boards on joists | 1m2 | 350 rub |
Sanding wooden floors | 1m2 | 105 rub |
Knauf floor device (expanded clay, EP) | 1m2 | 350 rub |
Laying plywood on logs (one layer) | 1m2 | 130 rub |
Laying plywood on logs (two layers) | 1m2 | 400 rub |
Laying plywood on mastic on anchors | 1m2 | 245 rub |
Antiseptic lag | 1m2 | 35 rub |
Antiseptic plywood | 1m2 | 35 rub |
Laying of noise and heat insulation (min. wool) | 1m2 | 70 rub |
Noise and heat insulation filling (expanded clay) up to 5cm | 1m2 | 60 rub |
Pouring with cement milk | 1m2 | 105 rub |
Laying parquet board (floating floor) | 1m2 | 320 rub |
Laying parquet boards with glue | 1m2 | 490 rub |
Laying laminate | 1m2 | 190 rub |
Laying fiberboard on the floor | 1m2 | 105 rub |
Laying chipboard on the floor | 1m2 | 105 rub |
Cork panel laying | 1m2 | 210 rub |
Linoleum flooring | 1m2 | 110 rub |
Linoleum flooring (for glue) | 1m2 | 140 rub |
Tiled linoleum flooring with welded seams | 1m2 | 385 rub |
Carpet tile flooring | 1m2 | 315 rub |
carpet flooring | 1m2 | 140 rub |
Carpet flooring with glue | 1m2 | 175 rub |
Installation of floor plastic plinth | p.m. | 70 rub |
Installation of floor plinth wooden | l.m. | 105 rub |
Installation of MDF plinth | l.m. | 120 rub |
Lacquering wooden skirting board | l.m. | 40 rub |
Installation of tiles | l.m. | 105 rub |
Nut installation | PCS. | 105 rub |
Floor painting | 1m2 | 140 rub |
Lacquering the floor | 1m2 | 120 rub |
Installation of GVL sheet in two layers | 1m2 | 210 rub |
Floor: parquet work |
||
Dismantling the plinth | m | 30 rub |
Dismantling plywood | 1m2 | 65 rub |
Dismantling of floors from panel parquet, parquet and laminated boards | 1m2 | 70 rub |
Dismantling of floors from piece parquet | 1m2 | 175 rub |
Dismantling a solid board | 1m2 | 210 rub |
Cutting plywood into sheets 760x760 mm | 1m2 | 40 rub |
Cutting plywood into sheets 625x625 mm | 1m2 | 60 rub |
Cleaning the screed from glue | 1m2 | 130 rub |
Cleaning the base from bituminous mastic | 1m2 | 420 rub |
Jointing cracks in a cement screed with a repair and putty mass | 1m2 | 80 rub |
Base/plywood priming | 1m2 | 35 rub |
Gluing plywood on t / s-insulating. interlayer (concrete base)* | 1m2 | 180 rub |
Gluing plywood on t / s-insulating. interlayer (wooden base)* | 1m2 | 154 rub |
Laying plywood on a concrete base on glue with a surcharge from above * | 1m2 | 174 rub |
Laying 12 mm plywood on a concrete base with glue and screws* | 1m2 | 175 rub |
Sanding laid plywood | 1m2 | 140 rub |
Installation and fastening of the lag | 1m2 | 360 rub |
Installation and fastening of the 2nd layer of log | 1m2 | 175 rub |
Flooring device (plywood 18mm) on logs | 1m2 | 130 rub |
Laying plywood on a wooden base | 1m2 | 130 rub |
Complex leveling of plywood by deep sanding | 1m2 | 275 rub |
Laying laminate flooring on a substrate (perpendicular to the wall) | 1m2 | 140 rub |
Laying laminate flooring on a substrate (at an angle to the wall) | 1m2 | 175 rub |
Laying cork on the substrate (perpendicular to the wall) | 1m2 | 175 rub |
Laying cork on the substrate (at an angle to the wall) | 1m2 | 210 rub |
Bonding cork (perpendicular to the wall) | 1m2 | 350 rub |
Bonding cork (at an angle to the wall) | 1m2 | 420 rub |
Bonding the parquet board to the base (perpendicular to the wall) | 1m2 | 245 rub |
Gluing the parquet board to the base (at an angle to the wall) | 1m2 | 315 rub |
Laying the parquet board on the substrate (perpendicular to the wall) | 1m2 | 210 rub |
Laying the parquet board on the substrate (at an angle to the wall) | 1m2 | 245 rub |
Laying strip parquet (Deck, Christmas tree, square) | 1m2 | 440 rub |
Laying strip parquet (Envelope) | 1m2 | negotiable |
Block parquet laying (Pletenka) | 1m2 | negotiable |
Laying strip parquet (offset square) | 1m2 | negotiable |
Laying strip parquet (Rhombus) | 1m2 | negotiable |
Laying strip parquet (Square with a star) | 1m2 | negotiable |
Laying piece (mosaic) parquet (fig. according to the drawing) | 1m2 | negotiable |
Laying strip parquet, varnished (Deck, Christmas Tree, Square) | 1m2 | negotiable |
Laying strip parquet of exotic species (Deck) | 1m2 | 490 rub |
Laying piece parquet ebony, jarrah (Deck) | 1m2 | 630 rub |
Laying strip parquet of the Karelian birch species (Deck) | 1m2 | 770 rub |
Laying modular parquet | 1m2 | 790 rub |
Solid board laying | 1m2 | 525 rub |
Laying a solid board, varnished / oiled | 1m2 | 560 rub |
Laying modular parquet varnished/oiled |
1m2 | 700 rub |
Laying solid board decking |
1m2 | 595 rub |
Sanding and puttying parquet (incl. abrasives) |
1m2 | 315 rub |
Removal of old varnish, sanding and puttying parquet |
1m2 | 330 rub |
Removal of old varnish, sanding parquet |
1m2 | 315 rub |
Removing old paint, sanding parquet |
1m2 | 350 rub |
Lacquer application type 1 (1 coat of primer and 3 coats of matte lacquer) |
1m2 | 175 rub |
Lacquer application type 1 (2 coats of primers and 3 coats of matt clears) |
1m2 | 210 rub |
Lacquer application type 1 (2x primer, 2x matt and 1x semi-matt clear) |
1m2 | 245 rub |
Lacquer application type 1 (2 coats of primer, 2 coats of matt and 1 coat of gloss varnish) |
1m2 | 280 rub |
Matting existing varnish. buffing and applying one layer of varnish |
1m2 | 105 rub |
Application of BONA oil |
1m2 | 175 rub |
Application of OSMO oil-wax 2 layers | 1m2 | 175 rub |
Tinting of the floor covering without chamfer with OSMO paint and application of OSMO oil-wax | 1m2 | 420 rub |
Tinting of the floor covering with bevelled OSMO paint and application of OSMO oil-wax | 1m2 | 525 rub |
Applying BONA CARL "S Deck oil | 1m2 | 175 rub |
Installing a cork strip | m | 175 rub |
Installing a cork strip along the radius | m | 210 rub |
Cork strip tinting | m | 70 rub |
Installation of a cork compensation threshold | m | 105 rub |
Installation of a curved cork threshold | m | 175 rub |
Installation of hatches 1st type (insertion of the finished hatch) | PCS. | 420 rub |
Installation of hatches 2nd type (insertion of the finished hatch and finishing of the hatch cover) | PCS. | 640 rub |
Installation of hatches 3rd type (manufacturing and tie-in hatch with hatch cover trim) | PCS. | 1 750 RUB |
Wall gap sealing | m | 105 rub |
Installation of skirting boards up to 69 mm high | m | 140 rub |
Installation of a curved plinth made according to a pattern | m | 490 rub |
Installation of a skirting board with a height of 70 mm | m | 210 rub |
curb laying | m | 385 rub |
Floor milling straight | m | 445 rub |
Curvilinear flooring milling | m | 700 rub |
Laying socket Ø | 1m2 | 2 450 rub |
Comprehensive floor maintenance using a single-disk machine (maintenance) | 1m2 | 175 rub |
Comprehensive maintenance of varnished floors | 1m2 | 105 rub |
Lifting of materials without elevator, sq.m/floor | 35 rub | |
Lifting of materials without lift (plywood), sq.m/floor | 60 rub | |
Transport during the work period (5% of estimated cost, but not less than 2000 rubles.) | 1 400 rub | |
Design and estimate work | 700 rub | |
Departure of the technologist to the object for measurements and consultation | 350 rub |
Single leaf door installation | PCS | from 1 200 rub |
Double door installation | PCS | from 1 750 rubles |
Dismantling of the door block (for 1 unit) without saving | PCS | 140 rub |
Threshold setting | PCS | 105 rub |
Installation of extensions | m.p. | from 140 rub |
Installing the seal | m.p. | 20 rub |
lock inset | m2 | 210 rub |
Installation of door opening limiters | 1m2 | 105 rub |
Inset peephole | PCS | 175 rub |
Door leaf replacement | PCS | 700 rub |
Door closer installation | PCS | 280 rub |
Installation of door hinges | PCS | 140 rub |
Dismantling the lock, handle | PCS | 35 rub |
Latch handle insert | PCS | 210 rub |
Dismantling the casing | PCS | 140 rub |
Painting doors from other sides | PCS | 560 rub |
Lacquer coatings | p.m. | 35 rub |
Installation of a plastic door (accordion type) | PCS | from 700 rubles |
Sliding door installation - 1 leaf | PCS | 1750 rub |
Sliding door installation - 2 sheets | PCS | 3100 rub |
Dismantling of the door block (for 1 unit) | PCS | 210 rub |
Arch installation | PCS | from 800 rub |
Installation of wire up to 2.5 sq. mm. open | m.p. | 40 rub |
Installation of wire from 3 to 6 sq. mm. open | m.p. | 45 rub |
Installation of wire 5x6 open | m.p. | 45 rub |
Installation of wire in the corrugation open | PCS | 80 rub |
Installation of wire in the cable channel | PCS | 70 rub |
Chasing under the wire in a brick | PCS | 115 rub |
Chasing under the wire in plaster, foam block | p.m. | 105 rub |
Chasing under wire in concrete | p.m. | 175 rub |
Installation of electric points (sockets, switches) overhead | PCS | 140 rub |
Making holes for concrete sockets | PCS | 105 rub |
Making holes for socket boxes on brick, plaster | PCS | 70 rub |
Installation of the socket | PCS | 35 rub |
Installation of electric points (sockets, switches) internal | PCS | 140 rub |
Making holes for the distribution box on brick, plaster | PCS | 140 rub |
Making holes for the junction box on concrete | PCS | 175 rub |
Junction box mounting open | PCS | 35 rub |
Mounting the junction box in the hole | PCS | 70 rub |
Disconnection of junction boxes | PCS | 245 rub |
Switchboard installation internal execution in brick | p.m. | 1400 rub |
Installation of machines | p.m. | 280 rub |
DIN rail mounting | PCS. | 35 rub |
Installation of a socket for an electric stove with a connection | PCS. | 210 rub |
Counter installation | p.m. | 1050 rub |
Installation of a spotlight | p.m. | 175 rub |
Installation of the lamp type "Armstrong" | p.m. | 175 rub |
Installation of a chandelier with connection | p.m. | from 490 rub |
Installation of a step-down transformer, stabilizer | PCS | 140 rub |
Fan mounting | PCS | 350 rub |
Installation of a ceiling fan with a chandelier | PCS | 1050 rub |
Underfloor heating (cable) | m2 | 700 rub |
Underfloor heating (minimum) | m2 | 700 rub |
Mounting the thermostat | PCS | 280 rub |
RCD installation | PCS | 280 rub |
Intercom handset installation | PCS | 350 rub |
Machine replacement | PCS | 250 rub |
TV splitter installation | PCS | 140 rub |
Installing an additional telephone point | PCS | 140 rub |
Bath installation | PCS. | from 1400 |
Hot tub installation | PCS. | from 1400 |
Shower cabin installation | PCS. | from 3850 |
Installation of a shower enclosure | PCS. | from 1400 |
Toilet installation | PCS. | from 1050 |
Sink installation | PCS. | from 800 |
Installing a curtain on a shower tray | PCS. | from 1400 |
Cutting technical holes in the pedestal | PCS. | 150 |
Installing a heated towel rail | PCS. | 1900 |
Installing a storage water heater | PCS. | 2150 |
Installing a tankless water heater | PCS. | 2100 |
Installation of a bidet, urinal | PCS. | 1050 |
Mixer installation | PCS. | 650 |
Connecting an additional mixer | PCS. | from 210 |
Installation of cold water pipes, hot water supply | m.p. | 280 |
Production of shrobes for cold water pipes, hot water in reinforced concrete | m.p. | 120 |
Production of shroba for cold water pipes, hot water in brick, foam blocks, gypsum | m.p. | 105 |
Installation of sewer pipes | m.p. | from 350 |
Production of shrobes for sewerage pipes 50 mm in reinforced concrete | m.p. | 175 |
Making a strobe for sewer pipes 100 mm | m.p. | 245 |
Production of strobes for sewer pipes 50 mm in brick, foam blocks, gypsum | m.p. | 105 |
Production of strobes for sewer pipes 100mm in brick, foam blocks, gypsum | m.p. | 115 |
Installation of a riser of cold water, hot water | m.p. | 350 |
Installation of a sewer riser | m.p. | from 435 |
Ball valve installation | PCS. | 280 |
Installation of a heating radiator (using welding) | PCS. | from 2450 |
Installation of a heating radiator (without welding) | PCS. | 2100 |
Installation of coarse water filters | PCS. | 400 |
Installation of fine water filters | PCS. | 420 |
Installation of cold water and hot water meters | PCS. | 700 |
Pipe insulation device | m.p. | 105 |
Siphon installation | PCS. | 350 |
Dishwasher and washing machine installation | PCS. | 560 |
Shower column installation | PCS. | from 560 |
Mounting the pressure reducer | PCS | 280 |
Manometer mounting | PCS | 280 |
Installation of a thermostat on heating radiators | PCS | 245 |
Installation of a drinking water filter | PCS | 350 |
Manifold installation | PCS | 630 |
Plug installation | PCS | 105 |
Installation of a sanitary cabinet | PCS | 1050 |
Installation of a sanitary hatch (metal) | PCS. | from 175 |
Pipe coloring | m.p. | 150 |
Ventilation grill installation | PCS | 430 rub |
Mounting the screen on the bath (standard) | PCS | 435 rub |
Coloring of sectional batteries | PCS | 210 rub |
Coloring of convector type batteries | PCS | 525 rub |
Sealing holes after laying communications | PCS | 140 rub |
Installation of the ventilation corrugation | p.m. | 350 rub |
Removal, bringing furniture (within the apartment) | man hour | 350 rub |
Hanging a mirror, cabinet | PCS | 525 rub |
Towel rail painting | PCS | 350 rub |
Hatch installation | PCS | 280 rub |
Curtain installation | PCS | 470 rub |
Installation of the heating radiator screen | PCS | 140 rub |
Blinds installation | PCS | 490 rub |
Installation of a ceiling curtain rod | PCS | 490 rub |
Installation in the bathroom fittings | PCS | 280 rub |
Loading, delivery of material (including the cost of the GAZelle) | hour | 1050 rub |
Unloading and lifting materials on the elevator | kg | 1,5 |
Garbage removal (including the cost of the GAZelle) | PCS. | 2800 rub |
Garbage removal (with lift) bag | bag | 40 rub |
Garbage removal (no lift per floor) bag | bag | 20 rub |
Dismantling the wooden floor | 1m2 | 105 rub |
Dismantling of floors from chipboard | 1m2 | 70 rub |
Dismantling the laminate | 1m2 | 50 rub |
Removing parquet | 1m2 | 105 rub |
Removing the parquet board | 1m2 | 70 rub |
Dismantling fiberboard from the floor | 1m2 | 45 rub |
Dismantling of linoleum (not on glue) | 1m2 | 20 rub |
Dismantling carpet (not glued) | 1m2 | 20 rub |
Dismantling of linoleum, carpet on glue | 1m2 | from 70 rubles |
Dismantling of floor granite slabs | 1m2 | 105 rub |
Dismantling of quartz-vinyl, PVC tiles | 1m2 | 70 rub |
Dismantling tiles from the floor (ceramic) | 1m2 | 105 rub |
Dismantling of cement screed up to 5cm | 1m2 | 175 rub |
Dismantling of cement screed up to 8cm | 1m2 | 245 rub |
Removing the cement plinth | p.m. | 40 rub |
Removing the concrete plinth | p.m. | 105 rub |
Dismantling the ceramic plinth | m.p. | 35 rub |
Dismantling the plinth floor | p.m. | 20 rub |
Dismantling the floor plinth with preservation | p.m. | 105 rub |
Nut dismantling | PCS. | 50 rub |
Removing plywood, hardboard | m.p. | 105 rub |
Dismantling of heat and sound insulation | 1m2 | 35 rub |
Recently, quite often we have been working on townhouses, we carry out a full range of repair and finishing works, starting with pouring stairs and ending with glued wallpaper.
Since the list of works and the concept at such facilities are often similar, we prepared standard estimates for Finishing work in townhouses of three types 100 squares, 150 and 180.
All work begins with the pouring of a monolithic staircase, this is where each estimate begins.
The option with a monolithic staircase is the most practical and convenient. Each estimate includes the filling of the stairs from the 1st to the 3rd floor.
After that, work is underway on the rough laying of engineering networks. Water, sewerage, heating, underfloor heating, ventilation, electrics and low current.
Plumbing is calculated for 2 bathrooms, on the 1st and 2nd floors.
Heating includes all turnkey work, from the installation of pumps to the installation of radiators and underfloor heating.
For ventilation, an extractor hood is provided in the kitchen and bathrooms.
After that comes the stage of pouring the screed.
Screed on the ground floor - always with insulation and waterproofing.
At this rough stage of work is considered completed.
Fine work usually begins with laying tiles in the bathrooms and on the 1st floor.
On the ground floor, in most cases, it is optimal to lay tiles over the entire area and lay a water-heated floor under it.
Also included in the estimate is the tiling of the stairs.
The tile is laid without grout at this moment and, if possible, is covered with hardboard so as not to get damaged.
Following this, drywall is mounted and the walls are puttied for finishing. At the finish line - we glue the wallpaper, paint the ceilings, wipe the tiles, install sockets, switches, chandeliers, clean up and hand over the object to the customer.
The cost of the work also includes cleaning of the facility and removal of garbage.
The estimate for the work is indicative and must be adjusted for each object.
For example, if on attic floor if you want just an empty space without partitions, it will cost less than building a bathroom and rooms there.
These estimates reflect only the cost of the work.
The cost of draft materials, namely plaster, sand concrete, putty, pipes, filling the boiler room, electrical and low-voltage cables, sound insulation, etc., usually comes out from 60 to 80 percent of the cost of work. In principle, we do not save on draft materials and purchase only the most reliable and durable materials.
If it is plumbing and heating, then it is a rehau on press fittings, if it is an electrician, then gost cables are required, etc.