AIA - the procedure for obtaining, the main problems and methods of solution.  Metering devices for used energy resources Form of a document confirming the compliance of the project documentation object

AIA - the procedure for obtaining, the main problems and methods of solution. Metering devices for used energy resources Form of a document confirming the compliance of the project documentation object

1000 price
question

issue resolved

Collapse

Lawyers Answers (3 )


1.1. Construction Supervision and Housing Control Service Krasnoyarsk Territory(hereinafter referred to as the Service) is the executive authority of the Krasnoyarsk Territory (hereinafter referred to as the Territory), which carries out regional state construction supervision, regional state housing supervision and state control and supervision in the area shared construction apartment buildings and (or) other real estate on the basis of and in pursuance of the Constitution Russian Federation, federal laws and other regulatory legal acts of the Russian Federation, the Charter of the Territory, laws of the Territory, legal acts of the Governor of the Territory and the Government of the Territory.
1.2. Full official name of the Service: building supervision and housing control service of the Krasnoyarsk Territory.

And in accordance with the order Federal Service on Environmental, Technological and Nuclear Supervision of December 26, 2006 N 1129 “On Approval and Entry into Force of the Procedure for Conducting Inspections in the Implementation of State Construction Supervision and Issuing Conclusions on the Compliance of Built, Reconstructed, Repaired Capital Construction Facilities with the Requirements of Technical Regulations (Norms and Rules ), other normative legal acts, project documentation»

27. Based on the results of the audit, an audit report is drawn up in the manner determined federal law dated December 26, 2008 N 294-FZ, according to established by the Ministry economic development of the Russian Federation dated April 30, 2009 N 141 "On the implementation of the provisions of the Federal Law" On the Protection of the Rights legal entities and individual entrepreneurs in the implementation state control(supervision) and municipal control” (registered by the Ministry of Justice of the Russian Federation on May 13, 2009, registration N 13915). In the absence of identified violations, the act drawn up based on the results of the inspection is the basis for the developer or technical customer to apply for the issuance of a conclusion on the compliance of the constructed, reconstructed capital construction object with the requirements, other regulatory legal acts and project documentation, including energy efficiency requirements and equipment requirements for the capital construction object metering devices used energy resources.
28. The body of state construction supervision, within 10 working days after receiving the application of the developer or technical customer specified in this Procedure, issues on the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements of energy efficiency and requirements for equipping a capital construction facility with metering devices used for energy resources (hereinafter referred to as the conclusion on compliance), and in the absence of grounds for issuing an opinion, it decides to refuse to issue such an opinion in compliance with the requirements of the Regulations on the implementation of state construction supervision in the Russian Federation and this Procedure.
V. The procedure for issuing conclusions on the compliance of constructed, reconstructed capital construction facilities with the requirements of technical regulations, project documentation, including energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources
29. Conclusion on compliance (to this Procedure), or a decision to refuse to issue such a conclusion (to this Procedure), is issued by an official of the state construction supervision body to the developer or technical customer within 10 working days from the date of the relevant application for issuance of the conclusion.
30. on compliance or refusal to issue such a conclusion is drawn up in 2 copies, each of which is signed by an official (persons) of the state construction supervision body who carried out the inspection of the completed capital construction object, and approved by order (instruction) of the head (deputy head) of the body state building supervision.

Good luck to you

received
fee 100%

Hello. The courts proceed as follows:

From the Resolution of the Fourth Arbitration Court of Appeal dated February 7, 2014 in case N A19-5453 / 2013


Paragraph 7 of Part 3 of Article 55 of the Civil Code of the Russian Federation establishes that in order to make a decision on issuing a permit to put an object into operation, it is necessary, among other things, documents confirming the compliance of the constructed, reconstructed capital construction object specifications and signed by representatives of organizations operating utility networks.
The form of the document confirming the compliance of the object with the technical specifications and the procedure for its issuance is determined by the organizations that issued the technical specifications.

That is the answer to the question:

Are we ourselves or is the energy supplying organization preparing such a document?

Alexander

Such a document is prepared by the ESO, and each may have its own form - a certificate, an act, a conclusion. That is why in the Civil Code of the Russian Federation its name is not specified, but simply indicated - a document.

DEPARTMENT OF CONSTRUCTION AND ARCHITECTURE

ORDER

ON THE FORM OF DOCUMENTS ATTACHED TO THE APPLICATION FOR THE PERMISSION TO COMMISSIONING THE FACILITY

(As amended by the orders of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a, dated May 17, 2010 N 41-a, dated November 8, 2012 N 106/1)

In order to establish uniform requirements for the form of documents attached by the developer to the application for issuing a permit to put an object into operation in accordance with Article 55 of the Town Planning Code of the Russian Federation,

I order:

1. Approve the forms of documents:

1.1. On the compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of design documentation in accordance with Appendix No. 1.

1.2. On the compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations in accordance with Appendix No. 2.

1.3. On the compliance of the constructed, reconstructed, repaired capital construction facility with the specifications in accordance with Appendix No. 3.

1.4. On the compliance of the parameters of the constructed, reconstructed linear facility with the requirements of design documentation in accordance with Appendix No. 4.

1.5. On the compliance of the constructed, reconstructed linear facility with the requirements of technical regulations in accordance with Appendix No. 5.

1.6. The act of acceptance into operation of the completed construction facility in accordance with Appendix No. 6.

(Clause 1.6 was introduced by order of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a)

2. Department of architecture and urban planning:

Administration of the Vladimir region dated 05/17/2010 N 41-a)

2.1. To be guided by paragraph 1 of this order when checking the availability and correctness of the documents attached by the developer to the application for issuing a permit to put objects into operation, if the issuance of permits to put an object into operation is referred by the current legislation to the competence of the department of construction and architecture of the regional administration.

2.2. Within ten days from the date of signing this order, send a copy of it to the local governments that issue permits for putting objects into operation.

2.3. Post annexes to this order on the official website of the Department of Construction and Architecture of the regional administration on the Internet.

(Clause 2.3 was introduced by order of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a)

3. Recommend local governments to be guided by paragraph 1 of this order when checking the availability and correctness of the documents attached by the developer to the application for issuing a permit to put objects into operation.

4. The control over the implementation of this order shall be assigned to the deputy director of the department, the chief architect of the region.

Department Director
construction and architecture
S.A.BOKOV

Appendix N 1. DOCUMENT on the compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of project documentation

Appendix No. 1
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37

(as amended by the order of the Department of Construction and Architecture
administration of the Vladimir region dated 17.05.2010 N 41-a)

DOCUMENT on the compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of project documentation

The location of the object _________________________________________________.

___________________________________________________________________________

Conclusion of the state expertise on project documentation****

N _____________________________ dated "____" _______________ _______ issued

___________________________________________________________________________
(name of the organization that conducted the state examination of the design
documentation)

List of buildings and structures included in the facility

Name of the building, structure

Type of work (new construction, reconstruction, overhaul)

Parameter name

unit of measurement

Built object

Total area of ​​the object

Number of floors above ground

Number of underground floors

Construction volume, incl. underground part

Height of floors above ground

Height of underground floors

Underground level

The height of the object, the mark of the highest point of the building, structure

Step of load-bearing walls, columns

building area

Other options

Types of engineering support of the object:

1. Engineering equipment interior

Name

Built object

Power supply

Water supply

Gas supply

Heating

Drainage

Ventilation

2. Outdoor networks

Length, m

According to the approved project documentation

Built object

Power supply

Water supply

Gas supply

Heat supply

Drainage

Structures and materials

Structural element

Structural solution and material

according to the approved project documentation

constructed object

Foundations

Exterior walls

Internal walls, partitions

Overlappings

Main power indicators of the object ***

Name of indicator

According to the approved project documentation

Built object

Number of sections

Number of apartments, incl.
1-room;
2-room;
3-room;
4 or more rooms

Number of workplaces

Performance

Capacity

Other indicators:

Energy efficiency indicators of the facility

Name of indicator

Standard value

actual value

specific value of consumption of energy resources, including:

Thermal energy, Gcal

Electrical energy, kW

Gas, cube m

Availability of metering devices, including:

Thermal energy, Gcal

Electrical energy, kW

Gas, cube m

Other indicators:

Parameters of the constructed, reconstructed, repaired facility
capital construction (strike out the unnecessary) __________________________
________________________________________________________________________
(name and location of the object *)

comply with the approved project documentation, including the requirements
energy efficiency and the requirements for equipping the facility with devices
accounting of used energy resources.

Placement of objects on land plot corresponds to the scheme
planning organization of the land plot, approved in the
project documentation.

_______________________________________________ __________ ________________

"_____" _____________ 200__

M.p.
______________________________________ __________ ________________
(position of responsible representative (signature) (full name)
customer or developer)

"_____" ______ 20__

________________


approved project.

*** Power indicators of an object are indicated depending on its
destination.

**** In the event that, in accordance with the urban planning
legislation, conducting a state examination of the design
documentation is not required, the words "not required" are entered in the column.

Appendix N 2. DOCUMENT on the compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations

Appendix No. 2
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37


Name of the property * ________________________________________________________

___________________________________________________________________________

Builder ________________________________________________________________
(name of the organization, full name of the individual)

Customer __________________________________________________________________

Design documentation developed by ____________________________________________

___________________________________________________________________________
(name of design organization)

Construction was carried out:

General contractor of construction _______________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

The main characteristics of the built, reconstructed,
renovated facility:

The total area of ​​the object, sq. m ______________________________________________

Construction volume, cub. m _____________, incl. underground part __________

Number of floors above ground ___________________, underground ________________

Height of floors overground _________________ m, underground _______________ m

Height of the object (mark of the roof ridge), m __________________________________

List of constructed (reconstructed) auxiliary facilities
destination ________________________________________________________________

___________________________________________________________________________
(garage, boiler room, TP, hydraulic fracturing, etc.)

Building area of ​​the building (buildings), sq. m __________________________________

Types of engineering support of the facility: _____________________________________

___________________________________________________________________________

water supply, sewerage, electricity supply, gas supply, heat supply,

___________________________________________________________________________
communication, centralized or individual

The constructed (reconstructed, repaired) capital facility

construction _____________________________________________________________
___________________________________________________________________________
(Object name *)

and its placement on the land plot meets the requirements of technical
regulations.


(position of the person carrying out the construction) (signature) (full name)

"___" ____________ 200__

________________


project.

Appendix N 3. DOCUMENT on the compliance of the constructed, reconstructed, repaired facility with the specifications

Appendix No. 3
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37

on the ________________________________________________________________________
(name of the type of engineering support: water supply,
power supply, etc.)

An object: ___________________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Builder (Customer) _____________________________________________________
(name of the organization, full name of the individual)

___________________________________________________________________________

Construction (reconstruction, overhaul) was carried out in

in accordance with the technical specifications N _____________ dated _________________,

issued by _________________________________________________________________

___________________________________________________________________________
(name of the organization that issued the specifications)

Design documentation developed by ____________________________________________

___________________________________________________________________________
(name of the person who completed the relevant section of the project)

___________________________________________________________________________

The work was carried out by ____________________________________________________________

___________________________________________________________________________
(name of the organization that performed the relevant type of work)

Conclusion:

As a result of the inspection of the object ______________________________________________

___________________________________________________________________________
(name of the object in accordance with the approved project)
it was established that the work was carried out in full in accordance with
specifications and allow for uninterrupted and safe
operation of the facility that meets current requirements

regulatory and technical documents, technical regulations.

___________________________________________________________________________
(name of engineering networks and structures)

accepted in the manner prescribed by law for balance, maintenance

___________________________________________________________________________
(name of the organization that accepted the networks for balance or maintenance)

________________________________________ __________ _____________________

operating organization) (signature) (full name)

"___" ________________ 200__

Annex N 4. DOCUMENT on the compliance of the parameters of the constructed, reconstructed linear facility with the requirements of design documentation

Appendix No. 4
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37

Name of the property * ________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Builder ________________________________________________________________
(name of the organization, full name of the individual)

Customer __________________________________________________________________

Design documentation developed by ____________________________________________

Conclusion of the state expertise on project documentation issued

___________________________________________________________________________
(name of the body of state expertise of project documentation)

___________________________ "___" ______________ ___ year N _______________

Construction was carried out ** ___________________________________________

on the basis of an agreement dated "___" _______________ 20_____ N _____________________


(strike out unnecessary)

The main parameters of the construction object

Parameter name

unit of measurement

According to the statement project documentation

Built object

Total length

Power (pressure, voltage, capacity, category, etc.)

For pipelines:

Laying method
(ground, aboveground, underground)

Pipe diameter

Gasket height
(with overhead method)

Depth
(for underground laying)

Material
Trumpets
Support (for above-ground laying)

For roads:

Road width within the right-of-way

Lane (track) width

Number of lanes

Estimated travel speed

Parameters of the constructed (reconstructed) linear object

___________________________________________________________________________
(Object name*)

___________________________________________________________________________
comply with the approved project documentation

Placement of a linear object on a land plot corresponds to the scheme
its placement, approved as part of the project documentation.

_______________________________________________ _________ _______________
(position of the person carrying out the construction) (signature) (full name)

_______________________________________________ _________ _______________
(position, responsible representative
Customer or developer) (signature) (full name)

"___" _____________ 200__

For roads:

Lane (track) width, m ___________, number of lanes _______

__________________________________________________________________________
(Object name *)

___________________________________ ___________ ____________________

construction)

"___" _____________ 200__

________________

* The name of the object is indicated in strict accordance with the approved
project.

** The name of the general contractor is indicated.

Appendix N 5. DOCUMENT on the compliance of the constructed, reconstructed linear facility with the requirements of technical regulations

Appendix No. 5
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37


Name of the property * ________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Builder ________________________________________________________________
(name of the organization, full name of the individual)

Customer __________________________________________________________________

Design documentation developed by ____________________________________________

___________________________________________________________________________

Construction was carried out general contractor construction)

___________________________________________________________________________

Construction characteristic: new construction, renovation
(strike out unnecessary)

The main parameters of the constructed (reconstructed) object:

Total length, m ____________________________________________________

Power (pressure, voltage, capacity, category, etc.)__

___________________________________________________________________________

For pipelines:

Pipe diameter _____________________________________________________________

Laying method: above ground, above ground, underground (strike out unnecessary)

Laying height for above-ground method, m __________________, support material

Or pipe laying depth, m _______________

For roads:

The total width of the road within the boundaries of the right of way, m ___________________________

Lane (track) width, m _______, number of lanes ___________

Estimated speed, km/h _______________________________________________

Constructed (reconstructed) linear facility

___________________________________________________________________________
(Object name *)

___________________________________________________________________________
meets the requirements of technical regulations.

________________________________________ ___________ __________________
(position, full name of the person carrying out (signature) (full name)
construction)

"___" _______________ 200__

________________

* The name of the object is indicated in strict accordance with
approved project.

Appendix N 6. ACT of acceptance into operation of the completed construction facility

Appendix No. 6
to the order of the department
construction and architecture
administration of the Vladimir region
dated 13.03.2007 N 37

(as amended by the order of the Department of Construction and Architecture
administration of the Vladimir region dated 08.11.2012 N 106/1)

ACT of acceptance into operation of the completed construction facility


Compiled by "____" ____________ 20__

Composed of:

Representative(s) of the customer _______________________________________________
(full name, position)

___________________________________________________________________________

Representative(s) of the contractor ______________________________________________
(full name, position)

___________________________________________________________________________

Representative(s) of the subcontractor ___________________________________________
(full name, position)

___________________________________________________________________________

SET UP:

The contractor presented the commission for acceptance of the object: __________________

___________________________________________________________________________

Name of the property *

___________________________________________________________________________

located at: __________________________________________________

2. The construction was carried out in accordance with the permit for
construction N ________________, issued by "___" ________ 20__ _________

___________________________________________________________________________
(name of the authorized body that issued the building permit)

3. Construction was carried out by:

General Contractor _____________________________________________________
(name of organization, legal address)

___________________________________________________________________________
(information on the availability of SRO approval)

Subcontractors __________________________________________________
(name of organizations and their legal address)

___________________________________________________________________________

___________________________________________________________________________

4. Project documentation is developed by _____________________________________

___________________________________________________________________________
(name of organizations and their legal address, information on the availability

admission SRO)

4.1. The project documentation was approved** on the basis of a positive
conclusion of the state examination dated "__" ______ 20__ N ____________
state environmental expertise N ______ dated "___" ________ 20__

5. Construction and installation work was carried out on time:

beginning of work ________________
(month year)

completion of work ________________
(month year)

6. The object presented by the Contractor for delivery corresponds to the indicators
power and characteristics established in the project documentation, work
performed in accordance with the contract (agreement).

DECISION OF THE ACCEPTANCE COMMISSION:

Object submitted for acceptance:

___________________________________________________________________________
(name of the property*)

___________________________________________________________________________

___________________________________________________________________________
(object location)

made in accordance with the project, the requirements of technical regulations,
prepared for commissioning and accepted by the acceptance committee.

Signatures of commission members***:

__________ ____________________ _____________________
(position) (signature) (full name)

____________ ____________________ _____________________
(position) (signature) (full name)

Note:

* The name of the object is indicated in strict accordance with the approved
project.

** In the event that, in accordance with the town planning legislation
conducting state examination of project documentation,
state ecological expertise is not required, fit into the column
the words "not required".

*** Signatures of members of the commission - legal entities are certified by a seal.

We will launch your business.

Our specialists have sufficient experience and professional connections for the speedy registration of the AIA. You don't have to waste precious time and delay the launch of the object.

Leave all the hard work to us.
We are at your service.

The final stage of the construction of the property is commissioning. The key document for obtaining the certificate of commissioning of the facility is statement of conformity (AIA).

Statement of Compliance (AIA) is “the conclusion of the state construction supervision body (in the event that state construction supervision is provided) on the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations and project documentation, including energy efficiency requirements and facility equipment requirements capital construction with metering devices for the energy resources used, the conclusion of the state environmental control in the cases provided for by part 7 of article 54 of this Code” (paragraph 9 of part 3 of article 55 Urban Planning Code Russian Federation RF).

Commissioning of the capital construction facility is carried out technical customer in accordance with previously agreed project documentation. The more detailed the project for the implementation of construction and installation works, the easier it is to formalize the commissioning of capital construction facilities with strict compliance with all requirements.

Each previous stage of work is documented by acts of concealed work, which must be submitted to the building supervision inspector. All these documents must be kept by the builder during the entire warranty period for the construction of the building.

The block diagram of the commissioning of the capital construction facility is shown below:

An AIA may be refused for the following reasons:

  1. During the construction, reconstruction of the capital construction facility, violations were made of the compliance of the work performed with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation, and such violations were not eliminated before the date of issuance of a conclusion on compliance.
  2. There is no act of verification after the completion of construction, reconstruction of the capital construction facility.

Other grounds for refusal to issue an AIA for the commissioning of capital construction projects regulatory documents not provided.

Therefore, for obtaining a conclusion on the conformity of the object the following must be ensured:

a) Compliance of the work performed with the requirements of technical regulations (norms and rules), other regulations.

Control over the fulfillment of the requirements listed in paragraph a) is carried out:

  • daily by technical supervision services in the structure of the Developer, with filling in the general work log and special logs provided for building codes. At the same time, in accordance with the requirements in the field of construction, it is necessary to carry out surveys of hidden works with the execution of relevant documents, monitor the compliance of materials used in the production of construction and installation work in terms of nomenclature, quantity and quality, etc.
  • periodically by supervisory authorities. The obligation to organize interaction with state construction supervision bodies also lies with the Developer's services from the moment the building permit is received. If violations are detected during the inspection process, the developer is obliged to take measures to eliminate these violations and draw up relevant documents.

From an article by the head of Gosstroynadzor S.P. Bullfinch:

“It should be noted that state construction supervision is carried out from the date of receipt of a notice of the commencement of work (part 5 of article 52 of the Civil Code of the Russian Federation) until the date of issuance of a conclusion on the compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations (norms and rules), other normative legal acts and project documentation. Therefore, a positive conclusion on compliance by the state construction supervision authority is issued only if construction supervision was carried out regularly throughout the entire construction period. And if, due to the fault of the developer, such supervision was not carried out, then supervisory authority has the right to refuse to issue an AIA. It is not the duty of the state construction supervision body to issue a conclusion on compliance if the object was built or part of the object was erected in violation of the established construction procedure.

b) Compliance of the work performed with the project documentation.

In the process of construction of almost any object, it becomes necessary to adjust some design solutions, replacement of individual materials with similar ones. The developer is obliged to coordinate such changes with the design organization exercising architectural supervision, and to document these circumstances accordingly.

c) Obtaining the act of the final inspection

In accordance with paragraph 26 of RD-11-04-2006 “When conducting a final audit, the procedure for conducting an audit provided for in Chapter III of this Procedure must be observed, and the following must be taken into account:
a) a fully constructed, reconstructed, repaired capital construction object is subject to visual inspection (including individual work performed, building structures, sections of engineering and technical support networks and applied Construction Materials(products);
b) all acts (orders, notices) on the elimination of violations (shortcomings) identified during the implementation of state construction supervision and building control

Before the final inspection of the object, the following must be carried out:

Individual testing of equipment and functional testing of individual systems, culminating in a trial run of the main and auxiliary equipment;
- test runs;
- an act of acceptance of the capital construction object (in the case of construction on the basis of a contract).

During the construction and installation of buildings and structures, intermediate acceptances of equipment units and structural elements of the structure, as well as hidden works, should be carried out.

Individual and functional tests of equipment and individual systems are carried out with the involvement of the customer according to design schemes after the completion of all construction and installation work.

Defects and imperfections made during construction and installation, as well as equipment defects identified during individual testing, must be eliminated by construction, installation organizations and manufacturers before the start of integrated testing.

Test runs are carried out during the commissioning of a capital construction facility before comprehensive testing. During a trial run, the operability of the equipment and technological schemes, as well as the safety of operation, should be checked.

Comprehensive testing must be carried out by the customer during the final inspection. Comprehensive testing checks the joint operation of the main units and all auxiliary equipment under load.
Comprehensive testing of equipment according to schemes not provided for by the project is not allowed.
Comprehensive testing of equipment is considered to be carried out under the condition of normal and continuous operation of the main equipment for 72 hours with a rated load and design parameters of steam, gas, pressure and water flow, etc.

In thermal networks, complex testing is considered to be carried out under the condition of normal and continuous operation of the equipment under load for 24 hours with a nominal pressure provided for in the start-up complex.

AT electrical networks comprehensive testing is considered to be carried out under the condition of normal and continuous operation under load of the substation equipment for 72 hours, power lines - for 24 hours.

At the time of signing the final inspection report, a complete set of as-built documentation is required, including:

Inspection certificates:

  • breakdown of axes of a capital object under construction;
  • geodetic center base;
  • hidden work, control over which must be carried out in a timely manner, before the implementation of subsequent work;
  • building structures
  • sections of engineering networks

In addition, the as-built documentation includes as-built production documentation with records of compliance with the work performed in fact. Also contains:

  • executive geodetic schemes;
  • documentation (drawings and diagrams) of sections of engineering networks;
  • results of tests and examinations of construction control;
  • acts of testing the applied technical devices;
  • documents on the quality of building materials;
  • some other data on the actual execution of the project;
  • special logs, the order of which is stipulated in RD-11-05-2007: general work log; journal of design organizations exercising architectural supervision; quality control logs (input and operational).

An example of a completed act on the compliance of the constructed facility with the requirements of technical regulations and project documentation

Hello, friends! In the last article, we considered the principle of drawing up an act of a completed construction object, and today we will talk about drawing up an act on the compliance of a constructed, reconstructed capital construction object with the requirements of technical regulations (norms and rules).

This document is required for issuing a commissioning permit. It is established in Part 3 of Art. 55 GRK RF.

Usually it is issued in the form of an act. Below is a sample of the completed version. You can also download the handicap of the act from the link an act of compliance with the parameters signed by the developer and the contractor.

Click on the picture to enlarge.

In addition to these two acts, it is still necessary to draw up an act on the compliance of the parameters of the constructed, reconstructed capital construction facility with the design documentation. Also this document required for issuing a permit to operate.

You may also be interested in:

Denis, if it's not difficult, explain by the asterisk at points 6 and 7?

1) Reading the explanation, I understand that these items are filled out for objects that do not require certificates of conformity (to the project and technical regulations). Moreover, these points (6 and 7) are just in the act of conformity (which is not required).

2) If we fill out the entire act (it is required), then should we skip paragraphs 6 and 7?

3) If the project is not subject to state expertise, is an act of compliance with the project and those regulations required? And if required, then why do points 6 and 7?

Document confirming the conformity of the constructed object

For private houses built?

I figured it out myself, thanks for the site! A lot of useful information!

Greetings, Alexey. I'm glad you figured it out. Thank you for rating the site.

Question on the act on the conformity of the parameters of the constructed object. The object is an apartment building with engineering networks. In paragraph 3. Linear objects - all on-site networks are listed. What indicators fit, for example, power supply networks - the length of the network or the length of the cable? According to the project, the length of the network is 180 m.p., the length of the cables is 180*4=720 m.p. The cadastral engineer prescribes - the actual length of the network is 720 m.p. (it does not specify the length of the cable or the length of the network). I think there will be problems in obtaining permission to enter the building?

reconstructed an apartment in the Moscow Ring Road with the permission of OWN forces (there is no contractor). How then to draw up an act of a completed construction object and an act on the compliance of the reconstructed capital construction object with the requirements of technical regulations? Should I go to BTI, ZhEK or somewhere else?

The largest free information and reference system of online access to the complete collection of technical regulations of the Russian Federation. Huge database of technical standards ( more than 150 thousand documents) and a complete collection of national standards, authentic to the official database of the State Standard. GOSTRF.com is over 1 Terabyte free technical information for all Internet users. All electronic copies of the documents presented here can be distributed without any restrictions. Distribution of information from this site on any other resources is encouraged. Everyone has the right to unlimited access to these documents! Everyone has the right to know the requirements set out in these regulations!

on compliance of the constructed (reconstructed, repaired) capital construction facility with the requirements of technical regulations

"__" ____________ 200_

Customer _____________________________________ represented by ________________________

Acting on the basis ________________,

General contractor ____________________________ represented by ____________________________

Acting on the basis _______________,

with this certificate we confirm that the constructed (reconstructed, repaired) capital construction object __________________________

(select one) (name

object in accordance with the approved project documentation)

meets the requirements of technical regulations.

2. The construction was carried out according to the project ____________________________________

(name of the body that approved the project, date)

conclusion of the state examination of project documentation _________________

date of conclusion, adjustments)

3. Seasonal work (if the deadlines for their implementation are postponed) for landscaping, the device of the top coating of access roads to buildings, sidewalks, utility, play and sports grounds, as well as finishing elements of the facades of buildings must be completed and handed over to the owner in the manner prescribed by the norms within the following terms:

The act of compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the technical conditions on the territory of the Leninsky municipal district of the Moscow region

<19gt; Заполняется для каждого вида инженерных сетей отдельно.

<29gt; Заполняется в случае привлечения к строительству инженерных сетей и сооружений субподрядных организаций либо организаций, выполняющих "прямые" подрядные договоры с заказчиком (застройщиком, инвестором).

<39gt; Пункт заполняется по объектам, которые не подлежат государственному строительному надзору в соответствии с требованиями п. 1 ст. 54 Градостроительного кодекса РФ и в отношении которых не требуется оформление заключения о соответствии построенного, реконструированного, отремонтированного объекта капитального строительства требованиям технических регламентов (норм и правил) и проектной документации. В указанный перечень должны быть включены материалы лабораторных исследований, испытаний и экспертиз, выполняемых органами Госсанэпиднадзора Московской области.

<49gt; Заполняется для объектов бюджетного финансирования.

<59gt; Заполняется, если на объекте осуществлялся авторский надзор за строительством.

Certificate of compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations

Annex No. 4 to the Administrative Regulations of the Administration of the Municipal Formation of the Serebryano-Prudsky Municipal District for the Provision of the Municipal Service "Issuance of a Permit for the Commissioning of a Capital Construction Object"

What else to download on the topic "Municipality9raquo;:

  • We will draw up a high-quality legal document
  • We specialize in all areas of law
  • Ask a question and get an answer within 10 minutes

Website-assistant for the preparation of various contracts.

Templates and forms. Everything is ready, from you - insert your data in the editor and print. If you have a template that you would like to post here, please use the feedback.

Document confirming the conformity of the constructed object sample

on the conformity of the parameters of the constructed (reconstructed,

"__" ____________ 200_

Acting on the basis ________________,

Customer ____________________________________ represented by _________________________

Acting on the basis ________________,

General contractor __________________________ represented by ______________________________

Acting on the basis ______________,

2. Construction (reconstruction, overhaul) of the capital construction object _______________________________________________________________

(name of the object in accordance with

approved project documentation)

located at: _________________________________________________

(indicate the full address of the object with the indication of the subject

Russian Federation, administrative region, etc. and building address)

was carried out under a project that has a positive opinion of the Moscow State Expertise dated "__" ____________________ 200_, No. _______________________, adjustment dated "__" ___________________ 200_ No. _________________________

3. Completed construction (reconstruction, overhaul) capital construction object has the following parameters:

1. Permission to commission an object is a document that certifies the completion of construction, reconstruction of a capital construction object in full in accordance with the construction permit, compliance of the constructed, reconstructed capital construction object with the urban planning plan of the land plot or, in the case of construction, reconstruction of a linear object the territory planning project and the territory surveying project, as well as project documentation.

2. In order to put the facility into operation, the developer shall apply to the federal executive body, the executive body of the subject of the Russian Federation, the local self-government body or an authorized organization exercising state management of the use of atomic energy and state management in the implementation of activities related to the development, manufacture, disposal of nuclear weapons and nuclear power installations for military purposes, or the State Corporation for Space Activities Roscosmos, which issued a construction permit, directly or through a multifunctional center with an application for issuing a permit to put the object into operation.

3. To make a decision on issuing a permit to put an object into operation, the following documents are required:

1) title documents for the land plot;

2) urban planning plan of the land plot or, in the case of construction, reconstruction of a linear facility, a territory planning project and a land surveying project;

3) building permit;

4) an act of acceptance of a capital construction object (in the case of construction, reconstruction on the basis of a contract);

5) a document confirming the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations and signed by the person carrying out the construction;

6) a document confirming the compliance of the parameters of the constructed, reconstructed capital construction facility with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and signed by the person carrying out the construction (the person carrying out the construction and the developer or technical by the customer in the case of construction, reconstruction on the basis of an agreement, as well as the person exercising construction control, in the event of construction control on the basis of an agreement), except for cases of construction, reconstruction of individual housing construction objects;

7) documents confirming the compliance of the constructed, reconstructed capital construction facility with the technical specifications and signed by representatives of organizations operating utility networks (if any);

8) a diagram showing the location of the constructed, reconstructed capital construction facility, the location of engineering and technical support networks within the boundaries of the land plot and the planning organization of the land plot and signed by the person carrying out the construction (the person carrying out the construction and the developer or technical customer in the case of construction, reconstruction on the basis of a contract), with the exception of cases of construction, reconstruction of a linear facility;

9) the conclusion of the state construction supervision body (if state construction supervision is provided) on the compliance of the constructed, reconstructed capital construction object with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction object with metering devices for used energy resources , the conclusion of the federal state environmental supervision in the cases provided for by Part 7 of Article 54 of this Code;

10) a document confirming the conclusion of an agreement on compulsory insurance of civil liability of the owner of a hazardous facility for causing harm as a result of an accident at a hazardous facility in accordance with the legislation of the Russian Federation on compulsory insurance of civil liability of the owner of a hazardous facility for causing harm as a result of an accident at a hazardous facility;

11) an act of acceptance of the work performed for the preservation of a cultural heritage object, approved by the relevant body for the protection of cultural heritage objects, determined by the Federal Law of June 25, 2002 N 73-FZ "On objects of cultural heritage (monuments of history and culture) of the peoples of the Russian Federation", during restoration, conservation, repair of this object and its adaptation for modern use;

12) a technical plan for a capital construction facility prepared in accordance with Federal Law No. 221-FZ of July 24, 2007 "On the State Real Estate Cadastre";

3.1. The document and conclusion referred to in clauses 6 and 9 of part 3 of this article must contain information on the standard values ​​of the indicators included in the requirements for the energy efficiency of the capital construction object, and on the actual values ​​of such indicators determined in relation to the constructed, reconstructed capital construction object as a result of the studies, measurements, examinations, tests, as well as other information, on the basis of which the compliance of such an object with the requirements of energy efficiency and the requirements for its equipment with metering devices for the energy resources used is established. During the construction, reconstruction of an apartment building, the conclusion of the state construction supervision body must also contain information on the energy efficiency class of the apartment building, determined in accordance with the legislation on energy saving and on improving energy efficiency.

3.2. Documents (their copies or information contained in them) specified in paragraphs 1, 2, 3 and 9 of part 3 of this article are requested by the authorities specified in part 2 of this article, in state bodies, local governments and subordinate to state bodies or bodies local self-government organizations that have these documents at their disposal, if the developer has not submitted these documents on his own.

3.3. The documents referred to in paragraphs 1, 4, 5, 6, 7, 8, 12 and 13 of part 3 of this article shall be sent by the applicant independently if the said documents (their copies or information contained in them) are not at the disposal of public authorities, bodies local self-government or organizations subordinate to state bodies or local self-government bodies. If the documents specified in this part are at the disposal of state authorities, local governments or organizations subordinate to state bodies or local governments, such documents are requested by the body specified in part 2 of this article, in the bodies and organizations at the disposal of which the said documents, if the developer has not submitted these documents on his own.

4. The Government of the Russian Federation may establish, in addition to those provided for by part 3 of this article, other documents necessary for obtaining a permit to put an object into operation in order to obtain in full the information necessary for putting a capital construction object on state register.

4.1. To obtain a permit to put an object into operation, it is allowed to require only the documents specified in parts 3 and 4 of this article.

5. The body or authorized organization exercising state management of the use of atomic energy and state management in the implementation of activities related to the development, manufacture, disposal of nuclear weapons and nuclear power plants for military purposes, or the State Space Corporation "Roscosmos", which issued a construction permit , within ten days from the date of receipt of an application for issuing a permit to put the facility into operation, they are obliged to ensure the verification of the availability and correctness of the execution of the documents specified in Part 3 of this Article, inspection of the capital construction facility and issue the applicant a permit to put the facility into operation or refuse to issue permission, stating the reasons for refusal. During the inspection of the constructed, reconstructed capital construction object, the compliance of such an object with the requirements established in the building permit, urban planning plan of the land plot or, in the case of construction, reconstruction of a linear object, the territory planning project and the land surveying project, as well as the requirements of project documentation, including including the requirements of energy efficiency and the requirements for equipping a capital construction object with metering devices for the energy resources used, with the exception of cases of construction, reconstruction of an individual housing construction object. If during the construction, reconstruction of a capital construction object, state construction supervision is carried out, inspection of such an object by the body that issued the construction permit is not carried out.

6. The grounds for refusal to issue a permit to put the facility into operation are:

1) the absence of the documents specified in paragraph 3 of this article;

2) non-compliance of the capital construction object with the requirements of the town-planning plan of the land plot or, in the case of construction, reconstruction, overhaul of a linear object, with the requirements of the territory planning project and the territory surveying project;

3) non-compliance of the capital construction object with the requirements established in the building permit;

4) non-compliance of the parameters of the constructed, reconstructed capital construction facility with the design documentation. This basis does not apply to objects of individual housing construction.

6.1. Non-receipt (late receipt) of the documents requested in accordance with parts 3.2 and 3.3 of this article cannot be grounds for refusing to issue a permit to put the facility into operation.

Compliance of the constructed capital construction object

The grounds for refusal to issue a permit to put the object into operation, in addition to the grounds specified in part 6 of this article, is the developer's failure to comply with the requirements provided for in part 18 of article 51 of this Code. In this case, a permit to put the facility into operation is issued only after it is transferred free of charge to the federal executive body, the executive body of the constituent entity of the Russian Federation, the local self-government body or an authorized organization exercising state management of the use of atomic energy and state management in the implementation of activities related to the development , manufacturing, disposal of nuclear weapons and military nuclear power plants, or the State Corporation for Space Activities Roscosmos, which issued a construction permit, information on the area, height and number of floors of the planned capital construction facility, on engineering and technical support networks, one a copy of a copy of the results of engineering surveys and one copy of each of the sections of the project documentation provided for in paragraphs 2, 8 - 10 and 11.1 of part 12 of Article 48 of this Code, or one copy of the fii schemes of the planning organization of the land plot with the designation of the location of the object of individual housing construction.

8. Refusal to issue a permit to put an object into operation may be challenged in court.

9. A permit to put an object into operation (with the exception of a linear object) is issued to the developer if the federal executive body, the executive body of the constituent entity of the Russian Federation, the local self-government body or an authorized organization exercising state management of the use of atomic energy and state management carrying out activities related to the development, manufacture, disposal of nuclear weapons and nuclear power plants for military purposes, or the State Corporation for Space Activities "Roscosmos", which issued a construction permit, was transferred free of charge a copy of the diagram showing the location of the constructed, reconstructed capital construction facility, the location of networks engineering and technical support within the boundaries of the land plot and the planning organization of the land plot, in order to place such a copy in the information system for ensuring urban planning ness.

10. Permission to put the object into operation is the basis for state registration of the constructed capital construction object, making changes to the state accounting documents of the reconstructed capital construction object.

10.1. A mandatory annex to the permission to put the object into operation is the technical plan of the capital construction object submitted by the applicant, prepared in accordance with the Federal Law of July 24, 2007 N 221-ФЗ "On the State Cadastre of Real Estate".

11. The permit to put the object into operation must contain information about the capital construction object in the amount necessary for its state cadastral registration. The composition of such information must comply with the requirements established in accordance with the Federal Law of July 24, 2007 N 221-FZ "On the State Real Estate Cadastre" for the composition of information in the graphic and text parts of the technical plan.

11.1. After the completion of the construction of a capital construction object, the person carrying out the construction is obliged to transfer to the developer of such an object the results of engineering surveys, design documentation, certificates of examination of works, structures, sections of networks of engineering and technical support of the capital construction object, other documentation necessary for the operation of such an object.

11.2. When carrying out work to preserve a cultural heritage object, a permit for commissioning such an object is issued taking into account the specifics established by the legislation of the Russian Federation on the protection of cultural heritage objects.

(Part 11.2 was introduced by Federal Law No. 315-FZ of October 22, 2014)

12. The form of permission to put an object into operation is established by the federal executive body authorized by the Government of the Russian Federation.

13. Within three days from the date of issuance of a permit to put an object into operation, the body that issued such a permit sends a copy of such a permit to the federal executive body authorized to exercise state construction supervision, if a permit has been issued for the commissioning of capital facilities. construction, specified in paragraph 5.1 of Article 6 of this Code, or to the executive authority of the constituent entity of the Russian Federation authorized to exercise state construction supervision, if a permit has been issued to put into operation other capital construction facilities.

document confirming the conformity of the constructed object sample

Appendix N 5 to the Administrative Regulations for the provision of municipal services "Preparation and issuance of permits for the commissioning of capital construction facilities by the administration of Pavlovo-Posadsky municipal district Moscow region"

DOCUMENT ON COMPLIANCE OF THE CONSTRUCTED, RECONSTRUCTED CAPITAL CONSTRUCTION FACILITY WITH THE TECHNICAL CONDITIONS Organizations operating engineering and technical support networks confirm that the facility completed by construction and prepared for commissioning _____________________________________________ (name of the construction object ________________________________________________________________________________, (reconstruction, overhaul) in accordance with the design documentation) located at: _________________________________________________, (name of the municipal district; settlement or urban district, street, avenue, lane, etc.) complies with the technical conditions for connecting the facility to the engineering and technical support networks ______________________________________________ (indicate the name of the engineering networks security, connection attached to the object _________________________________________________________________ of capital construction) Representatives of organizations operating utility networks: Heat supply _________________________________________________________________________________ (position) (name of organization) (signature) (signature decoding) M.P. Hot water supply ________________________________________________________________________________ (position) (name of organization) (signature) (signature) Cold water supply _________________________________________________________________________________ (position) (name of organization) (signature) (signature) M.P. Wastewater reception (sewerage) _________________________________________________________________________________ (position) (name of organization) (signature) (signature transcript) M.P. Power supply _________________________________________________________________________________ (position) (name of organization) (signature) (signature transcript) M.P. Other networks ___________________________________________________________________________ (position) (name of organization) (signature) (signature transcript)

Good afternoon friends! We discussed notifications in previous articles. But here is the result of all, about the end, what is?

Of course, in the end, we all want to receive from the GOS bodies a conclusion on the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices used energy resources.

Here is such a long name for this document, but in short, just AIA.

What it is?

According to part 3 of Art. 55 of the Civil Code of the Russian Federation for objects, it is necessary to submit a list of documents, including a conclusion on compliance issued by the bodies of the GOS.

If someone gives you permission to enter in the absence of this document, then he will be held administratively liable under Part 4 of Art. 9.5 of the Code of Administrative Offenses of the Russian Federation. They can also appeal your permission to enter and cancel it.

This document is issued by the GOS bodies based on the results of implementation during construction. reconstruction of the state construction supervision in accordance with the requirements of Art. 54 GK RF. If you did not notify the GSN authorities about the start of construction and the state construction supervision was not carried out at your facility, then you will not be issued a conclusion on compliance. You will have to put the facility into operation in a judicial proceeding, appointing a forensic examination of the work performed, etc.

What does the conclusion look like?

Click on the picture to enlarge

Usually, an act of final inspection and an order on approval of the conclusion are attached to the conclusion. The form of conclusion is given in RD 11-04-2006.

How to get it

To obtain this document, the developer must take the following steps

  • submit to the GOS authorities
  • if necessary file , subject to verification
  • submit on time
  • upon completion of construction, submit to the GOS bodies
  • after receiving the act of the final inspection without comments, apply for the issuance of an opinion ()

Also, the procedure for obtaining this document is described in detail in RD 11-04-2006.

If you have any questions feel free to ask them in the comments. See you soon.