Each person has repeatedly encountered the construction of an object or the installation of equipment: someone simply observes the process, someone directly performs it or participates in it. Therefore, it is important to understand what operations include construction and installation work(CMP).

Definition and composition of construction and installation works

Construction and installation work in Moscow is a complex of works for the construction of industrial and non-industrial facilities and the installation of various equipment in them.

The law clearly regulates the processes that are part of the construction and installation works. Their list is set out in Instruction No. 123 for construction work (clause 4.2). Construction and installation works include:

  • the processes of building bridges, roads, embankments, the construction of power lines and communications, the construction of bridges and roads, as well as other special works (underwater, aerial.);
  • measures for the construction, expansion, reconstruction and technical re-equipment of permanent and temporary facilities, which include all related works for the construction of metal, reinforced concrete, wood, metal-plastic and other structures, as well as actions for the design of ways for tower and other cranes;
  • work on organizing all types of water and electricity supply, heating, laying gas pipes and sewer lines;
  • processes for the construction of foundations and supports for technological equipment, lining and lining of furnaces, installation of sanitary units;
  • works related to landscaping and decorative design of territories;
  • settlement measures necessary to determine the costs of construction and its management;
  • establishment of material losses in connection with the destruction of objects, the restoration of which should be carried out at the expense of capital investments allocated according to project documentation for repair and construction work.

The total volume of construction and installation works includes a set of works on certain elements of buildings, structures or complexes, which was carried out for any period of time (month, year, etc.) both at launch facilities of a given time period and at facilities planned for delivery at the next scheduled time interval.

Work of construction and installation organizations

A person who is not associated with such a type of activity as the construction of new facilities and the reconstruction of existing ones is unlikely to know the full list of works performed by a construction and installation organization. But the importance of such companies can hardly be overestimated: any alteration in the house or on the site is not complete without their participation.

So, a professional construction and installation organization will qualitatively carry out the following types of work:

  • assembly (using ready-made units and parts), which include the assembly of structures from different materials, the laying of electrical networks, water supply, ventilation ducts, the construction of elevators;
  • construction, which are divided into:
    • general construction: digging holes, trenches and pits, overburden processes, soil compaction, etc. (earthworks); construction of stone walls, pillars or piers from single stones and blocks, bricks or masonry (stone work); all stages of erection of concrete and reinforced concrete structures (concrete work); installation of wooden floors, construction of wooden structures (carpentry); installation of roofing elements, gluing rolled materials onto the prepared base, other roofing activities (roofing); facing processes, wallpapering, plastering, flooring with linoleum and other finishing works;
    • special, related to the finishing of technological equipment (lining or lining furnaces and other units with refractory masonry, applying an anti-corrosion coating to devices), erecting individual structures (mine shafts, power or telephone networks, sanitary systems, etc.);
    • transport and handling: delivery of materials, structures, parts and equipment to the construction site using conveyors, dump trucks, trailers and other machines.

This is not the whole list of works performed by specialists of construction and installation companies. The client can order a service, for example, washing the hold for various cargoes, sandblasting any surface, painting a large capacity and other non-standard procedures.

Installation work in construction is the assembly of metal and reinforced concrete structures, pipelines, the preparation of construction equipment for the main work. In a word, installation is the initial preparation of a construction object for work.

When carrying out this, great attention is paid to the observance of safety regulations. Mounting building structures is included in the list of hazardous work for both direct workers and unauthorized people who got to the construction site. Many cases of high-rise cranes falling on residential buildings, collapse of interfloor ceilings. All this happens due to violation of technological requirements. Yes, and in the course of work, parts may break and fall. One of the most important points- this is the fencing of the construction site, the inadmissibility of unauthorized persons entering the site, the place of work on assembling structures must also be fenced.

The cost of installation work is calculated based on regulations, in which all-Russian prices (EniP) and regional prices (ERER) are fixed for different types installation work. They include works on installation of equipment, assembly of reinforced concrete structures and their maintenance. It also includes the area of ​​work performed, the volume, complexity of work, and climatic features. Be sure to take into account the various errors that may arise in the course of work, a possible increase in costs.

Installation work is an important stage in construction multi-storey buildings, on the quality of which all further operation of the structure depends in the future.

Stroymetmashservice LLC performs installation work in Moscow and the regions, construction and installation and design and installation work in various areas with different levels of complexity.

Installation work covers many areas. The scope of activities and the range of services provided by our company is quite wide:

  • installation of water intake equipment, sewerage and treatment facilities;
  • installation of equipment for enterprises of various industries and agriculture;
  • installation of equipment for consumer services and public utilities;
  • installation of equipment for ventilation, pumping, compressor installations;
  • installation of equipment for automation and alarm systems;
  • installation of boiler room equipment and much more;

FROM complete list types of construction and installation works you can find on our website or get information from the company's employees. Installation services are provided in the complex.

High-altitude installation work using the methods of industrial mountaineering is another area of ​​the company's activity.

Organization and production of installation works are carried out by qualified specialists in compliance with design requirements of the customer, in a timely manner, with the involvement of the necessary equipment for the production of installation work at the facilities. All installation and technical and commissioning works produced in strict compliance with technical safety regulations, building codes, SNIPs and state standards for the technology of work in the construction industry.

During the production of repair and installation work, we guarantee respect for the customer's valuable property / installation items.

The total cost of installation work and prices for certain types of installation work are determined based on the volume of installation work, the level of complexity and deadlines. We strictly comply with the terms of the contract and follow estimated cost installation works approved by the customer.

The installation work provided by our company begins with the receipt from the client of the design and budget documentation, permits and permits from regulatory authorities, drawing up a project for the implementation of construction and installation works, attracting contractors / firms for installation work. Next - technical preparation: work on the arrangement of the territory for the direct production of installation work.

The control and safety of installation work, the quality of construction and installation work are the direct responsibilities of Stroymetmashservis.

Regulations and rules establish General requirements to the organization of construction production in the construction of new, as well as the expansion and reconstruction of existing facilities. These standards must be observed by all participants in the construction of facilities.

When we talk about the construction, reconstruction or repair of any construction projects, we are always talking about a whole range of activities. The order of production is regulated by rules, regulations and requirements, which will lead to the desired result in the form of a strong, reliable and aesthetic building. What is construction work? They are a separate area of ​​construction, which cannot be dispensed with when performing capital repair work indoors, as well as during the construction of new buildings.

The essence and features of construction and installation works

The definition of construction and installation work is a very broad concept. It is understood as an operational process, which includes multidirectional actions that differ from each other in many criteria. Differences may be in the timing of execution, the essence of the process, methods and algorithm of construction or installation operations. The definition of construction and installation works (CEW) is a set of actions aimed at the construction, reconstruction or repair of structures and other facilities. As a rule, it is difficult for one company to complete the entire operational cycle of events. Their scale is colossal, and it is often impossible to cover all the tasks set. Today, there are many companies on the market: some carry out the entire operational process, others carry out installation or construction work. The choice of a professional with a narrow specialization determines the quality of performance. Often, in order to save money, many owners of private construction projects do some kind of work with their own hands. To achieve the desired result, it is important to understand the operational process, its sequence, to study the manual and the rules for performing construction or installation operations.


To date, there are three main areas:

  1. General construction industry.
  2. Sphere of transport and loading and unloading operations.
  3. Specialized type of work.

Each of the main areas is regulated by production rules, safety standards during execution, technological maps, SNiP rules, state standards, and UNiR calculation rules.

The essence of general construction activities

The category of general construction activities is the most extensive. The concept of this type of work contains several important stages on which the construction of buildings of any purpose depends. The entire operational process, as they say, from A to Z, must comply with the regulations and rules. The list of multidisciplinary events looks like this:

  1. A complex of geodetic processes carried out at construction sites:
  • control of geodetic parameters, calculations, characteristics;
  • performance of production of geodetic shooting.
  1. Preparatory activities that involve:
  • cleaning of the territory, preparation for the start of construction processes;
  • if necessary, the dismantling of structures or structures;
  • construction of temporary structures for the implementation of the main complex of construction activities.
  1. Excavation. The list of such activities involves the implementation of:
  • production of excavations, arrangement of vertical layouts;
  • production of trenches and digging of construction pits;
  • work with soil, its compaction, arrangement of “soil cushion”;
  • production earthworks in non-standard conditions (with subsidence of heaving soil).


Important! Earthworks involve the production of the entire range of activities exclusively by professionals. The operational life of the building, its reliability, regardless of the functional purpose, depends on the quality of such work.

In addition to the preparatory complex for civil works also includes processes that complete the main stages of construction:

  1. Stone work is a special type of event, which is a set of works on the construction, strengthening of the walls of buildings, supports and pillars. Stone work also includes brick laying, decorative facade finishing. All this can be done with your own hands, but you need to know the rules, principles and technologies of construction. Having mastered the knowledge and following all the rules, you can do the work yourself, significantly saving, but without compromising the quality of construction.
  2. The list of concrete and reinforced concrete works includes:
  • complex of reinforcing and formwork works;
  • welding and installation operations;
  • arrangement of monolithic structures.
  1. Roofing. This type of activity is referred to as installation work. The roof crowns any structure, serves as protection from heat loss and the effects of precipitation. The degree of comfort and safety of living in the house depends on the quality of execution. The subgroup of roofing activities includes:
  • installation of roofs from any materials (rolled, piece, metal and sheet);
  • arrangement of a roofing pie (steam and hydroprotection of structures);
  • welding and installation work on the construction of frames;
  • installation of windows of any type (including skylights);
  • arrangement of a drain.


  1. Finishing work. This type of operation can be performed even by a beginner in the construction business, the main thing is to know the rules and carry out quality control at every stage. To finishing work relate:
  • a complex of facade measures (decorative and protective cladding of the facades of buildings of any purpose);
  • welding and assembly production of frames of internal partitions made of metal, laying bricks, drywall;
  • painting and plastering complex, glazing production - aimed at decorative finishing of elements, protective cladding, glazing of structures.
  1. Complex of insulation works. Its essence lies in creating maximum comfort indoors, minimizing the external negative impact of the external environment, strengthening the properties of strength and practicality. This can also include insulation with bituminous materials, reinforcing shells, plates or bulk materials.

List of common construction work, including low-current work. They represent the installation of cables and wires, the voltage of which does not exceed 25 volts. The complex is necessary for telephone installation of the building, organization of systems fire safety, alarm installations and security systems of any type.


Direction of civil works

To understand what civil works are, you need to know the very essence of construction. It is this area of ​​activity that belongs to the title of one of the oldest and most revered areas. Undoubtedly, production and technological progress are moving forward, the production of new materials has been established, effective developments and innovative solutions are emerging. This development allows the construction of reliable and durable buildings, and the aesthetics of each completed object is excellent. There are two main branches of construction: capital and non-capital. The first type includes all buildings and structures that represent the category of real estate. This means that each building is connected to the ground by means of laying the foundation. There are several types of capital construction objects:

  • All types of buildings that are equipped with underground structures (plinths, foundations), as well as the ground part. This type of building system includes network engineering, organization of water supply and sewerage, ventilation systems. The general functional purpose of the category is the living and livelihoods of people.
  • All types of structures, which are flat systems and load-bearing structures with above-ground and underground part. Such facilities are intended, as a rule, for the movement of people or goods, the implementation of any production processes, as well as the storage of products. An example of this type of structures are dams, bridge structures, all types of roads (motorway, railway).
  • All objects are representatives of the category of construction in progress. These include buildings for which, for a number of reasons, a permit for operation has not been made or their construction has been suspended. As long as the operational process is not completed, proper control and admission to operation is not carried out, the buildings are called typical objects of construction in progress.

Objects - representatives of the non-capital category of construction include all structures of a temporary nature. These are trade kiosks, household facilities (sheds, pantries, barns), pavilions or hangars with a collapsible design.


Types of objects and their classification

The purpose of the erected objects can be very different and perform various functions. These can be industrial facilities, residential buildings, structures for agricultural needs. In accordance with functional purpose construction is divided into several types:

  1. Sphere of civil engineering. These are buildings of any number of storeys for living or public and commercial activities (administrative, retail, municipal or office).
  2. Sphere of industrial construction. This category includes all work on the construction of workshops, factories or factories, any production areas, combines.
  3. The sphere of agricultural construction is the construction of structures for livestock farms or agriculture. This also includes the construction of veterinary clinics, greenhouses, agricultural facilities.
  4. Transport construction. The category includes the construction of bridges, tunnels, highways.
  5. Hydraulic engineering. The sphere involves the construction of reservoirs, dams or canals.
  6. military sphere. It involves the construction of any construction objects for military and defense purposes.

Important! All types of construction and installation activities are regulated by the norms and rules of SNiP, GOSTs, as well as ENiR standards.

The construction object is, in its own way, the final product. All costs for its production must be strictly calculated. For this, there is the ENiR system, which is a complex of pricing calculations and estimated rationing. Project budgeting without knowledge of ENiR norms is impossible. All stages should be taken into account: construction design, conclusion of contracts for the performance of work, costs for the purchase of building materials, remuneration of workers.


Levers of control

In order for the structure to meet all technical standards and comply with the highest safety class, control is necessary. We will talk about the supervision of construction and installation works, which in its essence is a set of verification measures. The main goal is not to punish or apply fines, but to ensure that all specifications project. Technical control consists of the following stages:

  1. Financial check. Control and adjustment methods are applied, the goal is to minimize financial losses and risks. Evaluation and control takes place at all stages of construction. The supervisory mechanism is especially important when money from outside investors is used to build a building.
  2. Checking compliance with deadlines. At each stage, an act of completed work is issued, in accordance with which quality control is carried out.
  3. Control over the use of building materials. Production and construction technologies require the use of quality building materials with a set of required properties.

Important! Technical control is regulated by standards and documentation. The main levers of supervision include SNiP rules, ENiR regulations, compliance with established GOST standards.

In addition to quality control of work performance, technical supervision allows solving the following problems:

  • To prevent an unreasonable increase in the cost of construction and installation work and to identify the inconsistency of expenses with the agreed estimate.
  • Control of logging and technical documentation. Each operational process, the technology of its implementation is confirmed by an act. Data transparency allows timely detection of errors, deviations from SNiP standards or ENiR calculation rules.
  • Supervision and detection of violations in the process of construction of structures, errors in parameters, inconsistency with calculations.
  • Solving problems with soil shrinkage, the appearance of cracks, deformation and other problems with violation of technical specifications.


Who is supervising? These are professionally trained people with valuable construction experience. The supervisor of construction and installation works can be design engineers, specialists in general construction works. Their main tasks are to control compliance with process technology, conduct intermediate acceptance of work, and participate in engineering inspections. As a result of the control, an inspection report is signed, which indicates the inaccuracies and the period in which the errors must be eliminated. During the construction and installation process, a technical supervision log is filled in, its maintenance is an integral part of the construction process. At the end of construction, an act of completed work is submitted.

Author's supervision as a type of control over construction and installation works

In addition to technical supervision, architectural supervision is one of the auxiliary levers for optimizing construction production and quality control at all its stages. The sphere of construction is very specific, it has rules that must be followed strictly. This is a guarantee of the success of the construction, delivery of the object of proper quality on time.

  • Control may be exercised by management, legal and individuals on the basis of a signed cooperation agreement.
  • It includes a number of functions for conducting intermediate checks in order to control quality and identify errors in construction technology.
  • Supervision of compliance with all aspects of safety and compliance with environmental standards is carried out.
  • The management can make suggestions to improve the quality and optimize the construction and installation work at the facility.


The contract may also include any clauses specified in individually, depending on the functional and operational orientation of the construction object.

Activation of works in the process of construction

The finished project is a complete complex. To make sure that the established norms of SNiP, ENiR and other regulatory standards are met, an act is issued. It is also necessary to draw up an act of hidden works. What it is? Hidden works are "hidden" behind subsequent constructions or already completed activities. Compliance with quality standards is confirmed by an act drawn up in accordance with all the rules. The list of hidden works includes laying the foundation, land surveying, fixing wall structures. The quality of each of the above named hidden works, compliance with the norms of SNiP and other standards is confirmed by the act.

Advice! For each object, a list of hidden installation and construction works is prepared at the design stage. Such an act is rarely filled out at the stage of finishing the buildings.

Each stage is subject to separate control, even if simple repairs are made in the apartment (priming, finishing, insulation or installation of communications, and much more). An act, or a form confirming the operational process, must be drawn up by an authorized person, which is regulated by the SNiP standards.


Important!Maintenance of accompanying technical documentation is a mandatory procedure.

The act of carrying out hidden construction work is taken into account in the sixth section of the general work log. The act must strictly comply prescribed form, prepared in duplicate and signed by representatives of the construction commission. The act contains the following information:

  1. A complete list of all work performed with quality control marks at each stage.
  2. All information about the project documentation, which confirms the entire operational process. The section may contain drawings, diagrams, explanatory notes.
  3. Entering into the act the results of measurements, calculations, which confirm the level of quality of the work performed.
  4. List of conclusions indicating compliance with the norms of SNiP, ENiR and other requirements.

Today, finding a standard act confirming any operational process, and a guide to filling it out, will not be difficult. There are samples on specialized construction sites.


Safety at height

As they say in the song of the same name, assemblers-workers from a height send us greetings! In fact, construction and welding installation activities at height are extremely dangerous work, requiring compliance with a number of safety rules. For such work at height, it is categorically not recommended to take on beginners without appropriate training and experience.

Important! It is necessary not only to know the specifics of work, to be instructed and to study the manual for organizing safety at height.

For the personal comfort of workers at the facility, equipping the construction site requires the arrangement of sanitary and hygienic facilities, washrooms and cloakroom facilities, specialized catering facilities. Mandatory, prohibition and warning signs must be placed on the territory of the construction site. What activities relate to construction and welding and installation work at height?

  1. The implementation of the ascent or descent at a height of more than five meters vertically, the angle of inclination is not more than 75 degrees.
  2. All construction and welding and installation work that involves the risk of falling from a height of more than 1.8 meters or more. Including all welding and installation works that are performed on machines or mechanisms, protruding objects or structures, above the water surface.
  3. Any activity on platforms that are at least 1.8 meters high, located closer than two meters to an unfenced drop, and the height of the fences is less than one meter.


The list of basic safety requirements at height includes the following items:

  • permission to work is given to a person who has reached the age of 18;
  • before performing welding and installation work, the specialist must undergo a medical examination;
  • there are certain requirements for the qualifications of a specialist and his professional readiness to perform high-rise works.
  • the frequency of employee training should be at least once every three years (professional training and practical training are mandatory).

Important! Before the start of high-altitude welding and installation work, a planned inspection of the site and its preparation are required.

To give permission to work, it is first clarified possible reasons falls from a height, reliability of fasteners, the presence of fragile, slippery or prone to destruction of surfaces, the strength of structures. Must be taken into account climatic conditions carrying out high-altitude events, a list of tools needed at height and ways to deliver them to the top is compiled. Basic safety rules at height:

  • All authorized workers must be equipped with special safety belts. Each must have a test mark, admission to work with a belt that does not have a corresponding tag is prohibited.
  • High-rise welding and installation work should be carried out only in the daytime. If the regulations require the holding of night events, admission to work requires the installation of high-quality lighting on the site.
  • The admission to work in the winter period implies periodic cleaning of the surface from ice and snow.
  • The manual does not give permission to work if the wind force is 6 or more. During a thunderstorm, snowfall or fog, construction work at height is also prohibited.
  • All decking, transitions, fences, scaffolds are installed by specialists, taking into account load calculations. It is forbidden to move or rebuild them.
  • When moving an employee up or down, he is not allowed to hold tools or equipment in his hands. It is lifted on separate cables.


Important! In addition to the direct danger of falling from the height of the worker, there is a threat of injury to people who are below. To prevent this, warning signs and barriers are installed around the perimeter of the site.

The admission of unauthorized persons to the construction site is prohibited, the management is responsible for this. Employees must not use pneumatic tools for work at height, arbitrarily build stairs without preliminary calculation of loads, carry out any activity on sites without fences or faulty structures. Compliance with safety precautions in the production process at height is a guarantee of the personal health of the employee, as well as those who are at the bottom of the facility. Safety is the responsibility of management. The implementation of construction and installation activities is the most important and responsible part of the production of the entire construction process. Only competent planning, budgeting in accordance with the ENiR data, the choice of professional specialists and the optimal organization of construction and installation work together will help to achieve the desired result.

The general definition of "construction and installation works" includes a set of works performed during the construction of industrial, commercial, infrastructure, civil buildings, installation of structures, engineering systems and equipment. The list of works falling under the wording "construction and installation" is defined All-Russian classifier species economic activity 2018 (OKVED-2) with code classification OKVED 43.

In practice, SMR looks like a set of actions to be performed:

  • construction work, starting from the construction of the foundation and ending with the installation of the roof;
  • work on the installation of finished structures, elements, parts and equipment.

In the process of construction of large-scale buildings and structures, it becomes necessary to carry out a large number of jobs that require specialization. For their production, customers involve organizations that perform only these specific works, and as a result it turns out that several contractors work at the facility. This approach complicates the control over the quality of individual works and blurs the responsibility of the performers for the entire construction as a whole. Therefore, it is more expedient to cooperate with a company that is able to complete the entire cycle of construction and installation works, solve the tasks on its own and bear responsibility until the object is handed over to the customer.

Strategic priorities in competition

Today in all regions of Russia deployed large-scale construction objects for various purposes, and our company Innovative Structures has been successfully competing with other construction and installation organizations for more than 10 years. We have a stable mutually beneficial cooperation with customers and partners due to the fact that work at the facilities is carried out comprehensively from project development and "zero cycle" work to the implementation of the entire complex of construction and installation works and turnkey commissioning of facilities.

The professional growth and development of our company is facilitated by the presence of a team of highly qualified specialists, our own production base and a fleet of special equipment.

Benefits of partnering with industry leaders

The company's production facilities allow the production of metal structures of complex configurations, load-bearing floor trusses, and the organization and implementation of complex construction processes. We have a serious intellectual resource, as well as technical capabilities to carry out construction and installation work in unlimited volumes and in a short time.

We take on objects of any category of complexity, we have the technical base to perform a full cycle of construction and installation works, but we also do not refuse work only in specific areas, which are carried out by our specialists with guaranteed quality and at an adequate cost.

What our customers and partners value:

  • the presence of its own design department, which develops projects of any complexity and in all areas for the production of construction and installation works;
  • ten years of experience in the implementation of projects on construction sites;
  • production technically complex elements metal structures and the use of modern materials from other manufacturers;
  • carrying out the entire range of works in strict accordance with the project, state standards (GOST R), codes of practice for design and construction (SP) and industrial and industry standards, which ensures high quality of work at all stages of construction and installation work;
  • guaranteed result within the agreed time frame.

Our entire ambitious team works for the final result in a constructive dialogue and constant contact with customers.