Estimated regulatory base(SNB) is a set of normative and legal documents establishing the procedure for determining the estimated cost of construction. It is based on estimates.
Estimated standards are a set of estimated norms, prices and rates, combined into separate collections, along with rules and regulations and regulations that contain the necessary requirements. They serve to determine the local cost of construction, reconstruction of buildings and structures.
Estimated standards are classified as follows:
By structure and degree of enlargement: elemental, enlarged
elemental> estimated norms and prices for resources, estimated norms and prices for types of work;
enlarged > expressed in %, indicators and estimated standards;
On their basis, the need for resources is calculated: to perform work on the construction of this facility; to develop unit prices and determine the cost of semi-finished products prepared in stationary installations.
Estimated norms are a set of resources installed on the accepted measure of work. They serve to determine the standard expenditure of resources for the implementation of the project volume of the corresponding type of work as the basis for the transition to cost indicators. Estimated norms reflect the costs related to direct costs. Estimated norms serve as the basis for determining the need for resources at the stage of PIC and PPR:
Estimated norms take into account the industry average technological level of construction production. The influence of specific conditions for the production of works provided for by construction organization projects is taken into account by the coefficients given in the relevant collections. The estimated norms provide for indicators of labor costs, machine time and material consumption per unit of a structural element or type of work that are uniform for the entire territory of the country.
Unit rates are used to determine the estimated cost of construction, in particular direct costs (when using the base-index and base-compensation methods), certain types of work, structural elements, enterprises, buildings and structures. They are compiled on the basis of the accepted measure of work. The quotation for the accepted meter contains: the name and characteristics of the work, the total amount of direct costs, including a breakdown of direct costs. In addition, the labor costs of construction workers for the accepted measure of work are shown.
There are 2 types of unit rates:
The costs of materials not included in the prices are taken into account in the local estimate (local estimate calculation), in a separate line after the corresponding price:
where HP ij mat - the consumption rate of materials, products and structures not included in unit prices;
Q i - the volume (number) of certain types of work calculated in the unit rate meter;
Ц cmj mat - estimated unit price material resources, not taken into account by the i-th price;
j - nomenclature of material not included in prices for the i-th type of work;
i - type of work;
The formula for calculating the unit price:
where CH j is the estimated consumption rate of the i-th type of resource (determined according to the collections of GESN);
C cmj - estimated unit price of each type of resource;
j=1-3 nomenclature of resource costs (material, labor, technical).
Estimated construction cost.
Since the estimated cost of construction serves to determine the size of capital investments, all costs in it are grouped in accordance with the technological structure of capital investments:
WITH STR. = WITH STR.R + WITH MONT.R + WITH SET. + C PR. + WITH NEXT.
C STR.R - the estimated cost of construction work, namely:
C MONT.R - estimated cost installation work.
THE CATHEDRAL. - Estimated cost of equipment, furniture and inventory.
C PR - the cost of other costs related both to the construction as a whole and to individual objects and works.
They are classified as follows:
WITH NEPR. - a reserve of funds for unforeseen expenses and expenses, which is intended to reimburse the cost of work and expenses, the need for which arises during: working documentation; during construction as a result of clarification design decisions or construction conditions for objects.
Estimated cost of construction and installation works.
In the practice of estimated rationing and pricing, the estimated cost of construction, the cost of construction and installation works, are combined into a single cost item - the estimated cost of construction and installation works (C and construction works).
C CMP = C STR.R + C MOUNT.R = PZ + HP + P cm
PZ- direct costs - costs directly related to the performance of work at the construction site, reflecting the cost of the resources used (material, labor, technical).
PZ \u003d M + ZP C + EMM
M- the estimated cost of building materials, products, structures necessary to carry out the design scope of work.
It is determined on the basis of the estimated prices for these material resources, the "free" type.
where R i k mat - the consumption of certain types of material resources for the implementation of the i-th type of work;
C smk 1 unit - estimated price for 1 unit of a measured individual type of material resources:
i= 1-n - types of work performed:
k=1-m - nomenclature of used material resources;
M and C smk 1 units are calculated in accordance with MDS 81-2-1999.
ZPS- labor costs of construction workers directly involved in the performance of work, as well as workers involved in the movement of material resources from the on-site warehouse to the place of laying or installation.
Payroll funds (WPS) include:
It is determined in accordance with MDS 83-1-99 "Methodological recommendations for determining the amount of funds for wages in contract prices and estimates for construction and wages for construction and installation and repair workers construction organizations.
where ZP months is the monthly salary of a construction worker;
T slave - normative labor intensity of this type of work;
t months - the average monthly number of working hours with a 40-hour working week, determined as follows:
where T slave year - the annual number of working hours established according to the production calendar - is approved by the Ministry of Health and Social Development for 2009 - 1987 hours.
EMM- costs associated with the maintenance and operation of construction machines and mechanisms.
j=1-m - types of machines used to perform the i-th type of work;
T ij mach-hour - the time of operation of certain types of machines and mechanisms for execution i-th species works;
C smj mash-hour - the estimated cost of operating machines and mechanisms per 1 mash-hour.
The cost of 1 machine-hour of construction machines and mechanisms, as well as vehicles determined in accordance with MDS 81-3-99. It consists of: one-time costs (delivery of machines and mechanisms to the construction site, if necessary, their installation and dismantling); annual ( fixed costs) - depreciation deductions for the restoration of the original cost; current ( operating costs) - the cost of remuneration of workers involved in the maintenance and management of construction machines and mechanisms and line personnel as part of the participants (teams); costs of material resources.
HP- overhead costs - costs for the creation of construction and installation organizations general conditions production, its management, organization and maintenance.
HP includes the following cost items:
HP is determined by:
P cm- estimated profit - funds intended to cover the expenses of the contractor for the development of production and the social sphere, as well as material incentives for employees:
Np cm - the rate of estimated profit, determined according to MDS 8-25-2001 "Guidelines for determining the amount of estimated profit in construction, taking into account the letter of the Federal Antimonopoly Service and Housing and Public Utilities No. AP-5536/06 dated November 18, 2004 "On the procedure for applying the estimated profit standards in construction"
Estimated construction cost:
Estimated cost of construction - amount Money necessary for its implementation in accordance with the design materials.
In accordance with MDS 81-35.2004, the following methods can be used when determining the estimated cost of construction:
At the first stage, the estimated cost of certain types of work is determined at the basic price level, depending on the type of unit prices, the PZ is determined in the following way:
For closed rates:
At open rates:
where CH ij is the consumption rate of material resources unaccounted for by ER;
C cmj - the estimated price of a unit of measurement of material, unaccounted for by EP.
At the second stage, on the instructions of the customer, the estimated cost of construction can be transferred to the current level using appreciation indices. Appreciation indices are developed separately for construction and installation works, for new construction, reconstruction, etc.
2. resource method
Represents a calculation in current or forecast prices resources needed to implement the project. For this you need to know:
Combination resource method with a system of appreciation indices for certain types of resources. In this case, the following schemes are possible:
M t / y \u003d M used * Y beats
B) the cost of basic resources is determined at the current price level (according to the range of resources, the prices for which are monitored by regional pricing centers (quarterly))
The estimated cost of construction is the basis for:
On the basis of this indicator, accounting and reporting, evaluation of the activities of contractors and customers are carried out. Based on the estimated cost of construction, in the prescribed manner is determined book value(initial) put into operation fixed assets for buildings and structures constructed by the enterprise.
Based on the estimated cost of construction, the following is carried out:
The composition of the estimate documentation:
To determine the estimated cost of construction of design enterprises, buildings and structures, estimate documentation is compiled:
Estimated documentation is compiled in a certain sequence, constantly moving from small to larger construction elements, which are:
Type of work => construction site => start-up complex => construction phase => construction as a whole
At the "project" stage, the structure of the estimate documentation includes object and local estimates, calculations, estimates for certain types of costs, a summary estimate of the cost of construction and, if necessary, a summary of costs.
At the stage of "working documentation" - object and local estimates.
Contractual price, its composition:
Mutual settlements between the customer and the contractor for the performance of work (rendering of services) are carried out on the basis of the contractual price. The basis for the formation of a DC is the estimated cost of construction, which is determined as part of the estimate documentation. The DC is formed by the customer and the contractor on an equal basis, either based on the results of tenders, or on the basis of direct negotiations. As a result of the joint decision, a protocol for the approval of the DC for construction products is drawn up, which is an integral part of the contract.
DC is composed of:
DC \u003d C Subr + C dr
where C Subr - estimated cost of contract work
С dr - the estimated cost of other costs, the obligations for the implementation of which are assigned to the contractor
C Subr \u003d C smr + C Other
C Other - the estimated cost of the contractor's other costs, provided for in Chapter 10 of the consolidated estimate calculation
C smr \u003d PZ + NR + P cm + Z lim
Z lim - limited costs (for the installation of temporary, title buildings and structures, for the winter rise in the cost of work)
Relative values of the structure:
Relative values are the result of comparing (dividing) two statistical values. The denominator contains the value with which it is compared - the base of comparison, and the numerator contains the compared indicator. The relative values of the structure characterize specific gravity, in percent, part of the population in its total value taken as 100%.
Compiled at prices as of Q3 2014.
No. of estimates and estimates |
Name of chapters, objects, works and costs |
Estimated cost, thousand rubles |
Total estimated cost, thousand rubles |
||||
Construction work |
installation works |
equipment, furniture and inventory |
other expenses |
||||
Chapter 1. Preparation of the construction site |
|||||||
Preparation of the construction area |
(1654,79-165,48 ) |
(1654,79*0,1 ) |
(33095,86* |
||||
Total for Chapter 1 | |||||||
Chapter 2 |
|||||||
Road bed with powdered shoulders | |||||||
Total for chapter 2 | |||||||
Chapter 3 |
|||||||
road clothes | |||||||
Total for Chapter 3 | |||||||
Chapter 4 |
|||||||
Artificial structures (pipes) |
(33095,86*0,139 ) | ||||||
Chapter 4 Total | |||||||
Chapter 5 |
|||||||
Intersections and junctions |
(138686,54*0,035 ) |
Annex K continued
Total for chapter 5 | |||||||
Chapter 6 |
|||||||
Furnishings and accessories of the road |
(100990,36*0,046 ) | ||||||
Total for chapter 6 | |||||||
Chapter 7. Buildings and structures of road and motor transport services |
|||||||
Buildings and structures of the road and motor transport service |
(2019,82-242,38-58,17 ) |
(242,38*0,24 ) |
(2019,81* |
(100990,36* |
|||
Total for chapter 7 | |||||||
Chapter 8 | |||||||
Total for chapters 1-8 | |||||||
Chapter 9. Temporary buildings and structures |
|||||||
GSN 81-05-01-2001 |
Construction of temporary buildings and structures |
(151394,71*0,041 ) | |||||
Total for Chapter 9 | |||||||
Total for chapters 1-9 | |||||||
Chapter 10. Other work and costs |
|||||||
Estimated calculation No. 1 |
Additional costs for the production of construction and installation works in winter | ||||||
Initial data |
Costs for the transportation of health care workers by road transport |
(157662,44*0,0085 ) | |||||
MDS 81-35.2004 app. 8 p. 9.9 |
Construction risk insurance payments |
(158070,31*0,02 ) | |||||
Initial data |
Relocation of construction organizations from one construction site to another |
(157662,44*0,005 ) | |||||
Chapter 10 Total | |||||||
Total for chapters 1-10 |
End of Appendix K
Chapter 11 |
|||||||
Order GUS TO dated December 4, 2006 No. 267-od |
Technical Supervision |
(1275,13/4,95+166268,37/7,56+ 3350,87/3,135*1,1269*1,002) | |||||
Total for Chapter 11 | |||||||
Chapter 12 |
|||||||
Design and survey work |
167543,49 *0,02 | ||||||
Post-new PRF dated March 5, 2007 No. 145 |
Expertise of design and estimate documentation | ||||||
MDS 81-35-2004, P.8, p. 12.3 |
(167543,49*0,002 ) | ||||||
Chapter 12 Total | |||||||
Total for chapters 1-12 | |||||||
Funds reserve for unforeseen work and costs |
(161313,74*0,03 ) |
(242,38* |
(12521,79*0,03 ) | ||||
Total budget calculation | |||||||
including refunds. |
(6209,57*0,15 ) | ||||||
Capital investments in the road | |||||||
Construction 1 km of road | |||||||
Tax Code of the Russian Federation, Chapter 21 | |||||||
Total according to the consolidated estimate calculation with VAT |
The calculation of the rate of winter appreciation in Chapter 5 of the consolidated estimate is carried out in the manner set forth in Table P.I.1
Table 1 - Calculation of the rate of winter appreciation according to Chapter 5
*Chapter 11 cost calculation:
2404,30 = (167543,49+ 4192,16) * 1,4/100
** Calculation of costs according to chapter 12 (examination of design and survey products):
506,20 = 3350,87/3,135*12,69/100*3,732
(
- the average index of appreciation of design and survey works for the III quarter of 2014, where 3.12 is the index of appreciation of design work for construction; 3.15 - the index of appreciation of survey work for construction, according to Appendix 3 to Order No. 617-od of July 15, 2014)
APPENDIX L
Construction of the highway IV since. in the Tyumen region
Estimated calculation No. 1
additional costs in the production of construction and installation works in winter
Compiled at current prices as of Q3 2014.
Local estimate number |
Name of structures and types of work |
Estimated cost at the current price level, rub. |
Winter rise in prices for structures and types of work |
|||||
excluding costs for temporary buildings and structures |
taking into account the cost of temporary buildings and structures |
estimated rate, % (GSN 81-05-02-2007) | ||||||
construction |
installation work |
construction works |
installation work |
construction works |
installation work |
|||
PM No. 01-01-01 |
Preparatory work | |||||||
PM No. 02-01-01 PM No. 02-01-02 |
Road bed with powdered shoulders | |||||||
PM No. 03-01-01 |
road clothes | |||||||
PM No. 04-01-01 |
Artificial constructions | |||||||
PM No. 05-01-01 |
Intersections and junctions | |||||||
PM No. 06-01-01 |
Conditions and accessories of the road | |||||||
PM No. 07-01-0101 |
Buildings and structures of the road and motor transport service | |||||||
TOTAL |
APPENDIX M
Norms of additional costs for the construction of temporary buildings and structures in the production of construction and installation and repair and construction works (GSN 81-05-01-2001 and GSNr 81-05-01-2001)
Name of types of construction of enterprises, buildings and structures |
Cost rate |
||
For construction and installation works |
|||
Highways of national importance and local (hard-surfaced) 1-4 categories without tunnels and bridges (overpasses) more than 50 m long: | |||
When using temporary mobile asphalt and cement concrete plants for road construction | |||
Upon receipt of asphalt concrete and cement concrete for road pavement from operating stationary enterprises | |||
Railway and road bridges over 50 m long and overpasses | |||
City bridges and overpasses | |||
In places of permanent deployment of bridge-building organizations | |||
In other points | |||
Works on the arrangement of streets, driveways, sidewalks, green spaces of cities and towns | |||
Notes. 1. Estimated cost rates are determined as a percentage of the estimated cost of construction and installation works based on the results of chapters 1-8 (columns 4 and 5) of the consolidated estimate calculation of the cost of construction. 2. When compiling estimate documentation for the reconstruction of buildings and structures, a coefficient of 0.8 is applied to the specified standards. 3. During construction in the regions of the Far North and areas equated to them, in high-mountainous regions and waterless areas, the costs of temporary buildings and structures should be determined according to the given norms. |
|||
For repair and construction work |
|||
Capital repairs of landscaping facilities | |||
City roads and driveways | |||
Green spaces | |||
City bridges, embankments, bank protection works |
APPENDIX H
Estimated rates of additional costs in the production of construction and installation works in winter
In the course project, it is required to determine the amount of capital investments required for the construction of the projected highway. To calculate the estimated cost of the road, the estimated cost of individual structural elements and types of work is first determined. The basis for their determination are unit prices or aggregated indicators of the estimated cost.
Estimates for the most important structural elements of the road (base, coating) are compiled on the basis of unit prices in order to take into account their design, organizational and technical features. For other structural elements and types of work, estimates can be developed on the basis of aggregated cost indicators, including direct costs, overhead costs and estimated profit.
A collection of unit prices is a document in which, on the basis of estimated norms and prices, the amount of direct costs for performing a unit of volume of certain works is established. As part of the cost provided for by any unit price, includes the wages of construction workers, the cost of operating construction machines, including the wages of machinists, and the cost of materials.
Depending on the sectoral focus, 49 collections of unit prices (ER) have been developed. The EP collections were developed at the base price level (as of January 1, 2001) for the conditions of the 1st base region (Moscow Region) and are an integral part of the pricing and estimated rationing system in construction operating on the territory of the Russian Federation.
Collections of EP for construction work are divided into federal (FER), territorial (TER) and sectoral (OER). In each collection, unit prices are arranged in a certain sequence and coded. For example, the unit price number 30-01-001-1 means that it is placed in collection No. 30 and has a serial number 01-001-1.
Under the terms of the course project, the cost of the pavement device is determined at unit prices. The local estimate for the installation of pavement is calculated using FER No. 27 " Car roads» according to form 4 (see file «Form 4») in the following order.
Table 1. Initial data
Table 2. Types and volumes of work in the construction of pavement with cement concrete pavement
Type of work and unaccounted materials |
Table FER No. 27 |
Unit rev. |
Scope of work |
The device of the c / w coating with a thickness of 20 cm | |||
fittings | |||
Jointing in fresh concrete | |||
black sand | |||
The device of the basis from crushed stone M1000 fr.40-70 mm 15 cm thick | |||
>/<15 см | |||
The device of the basis from crushed stone M700 fr.40-70 mm 15 cm thick | |||
>/<15 см | |||
The device of the underlying layer of the base of sand | |||
Sand for construction work |
Having determined the list of works on the arrangement of structural layers of pavement, from the collection of FER No. 27 we write out direct costs per unit of the type of work, including the basic wages of workers, the cost of operating machines, including the wages of machinists and the cost of materials.
In the general case, the developer of the estimate is faced with the fact that the thickness of the structural layer considered by him does not coincide with the thickness of the layer taken into account by the unit price of the FER collection. Then it is necessary to adjust the unit price from the FER, recalculating it to the design thickness of the pavement structural layer. In the course project, we use the following table to describe such adjustments.
Table 3. Recalculation of unit prices
FER rate number |
Layer thickness included in the price, cm |
Adjusted coefficient |
Cost per meter, rub. |
||||||||||
including |
|||||||||||||
basic salary |
operational machines |
material cost |
|||||||||||
including ZPm |
|||||||||||||
Recalculation of the unit price for the installation of a base made of crushed stone with a thickness of 24.8 cm, rub./1000m2 |
|||||||||||||
Recalculation of the unit price for the installation of a base made of crushed stone with a thickness of 14.8 cm, rub. / 1000 m2 |
|||||||||||||
Here, the adjustment factor is calculated by the formula:
i\u003d (h f -h t) / h to,
where h f is the actual thickness of the structural layer according to the assignment, cm;
h t - thickness of the structural layer, taken into account by the FER table, cm;
h k - change in the layer thickness, taken into account by the price for adjusting the FER table, see.
We calculate the volume of unaccounted for materials by multiplying their rate of expenditure on the accepted meter by the amount of work. We determine the cost of unaccounted for materials for the entire scope of work by multiplying the amount of materials in the appropriate units of measurement by the cost per unit volume of material at the price of the FSP (FREE construction site).
We determine the amount of direct costs as a whole according to the estimate as the sum in the column "Total". We calculate the amount of overhead costs by multiplying their norm (142%) by the amount of the wage fund received as the sum of the wages of workers and the wages of machinists. Estimated overhead costs are set in the "Guidelines for determining the amount of overhead costs in the construction of MDS 81-33.2004" in% by type of work.
We determine the value of the estimated profit as the norm as a percentage of the wage fund. The estimated profit rate (95%) is set in the "Guidelines for determining the estimated profit in construction" MDS 81-25.2004 "in% by type of work. All calculations are recorded in Form 4.
The estimated cost of pavement works in base prices of 2000 is found by summing up direct costs (PZ), overhead costs (NR) and estimated profit (P): C = PZ + NR + P.
Table 4. Form 4
The amount of capital investments required for the construction of a highway is estimated by developing a consolidated estimate.
The basis for the development of a consolidated estimate calculation are local estimates for individual structural elements and types of work, compiled at unit prices or aggregated indicators of the estimated cost, as well as estimates (the cost of temporary buildings and structures, design and survey work, the cost of maintaining the management of the facility under construction) .
The summary estimate calculation consists of 12 chapters and a reserve for unforeseen work and costs. The first seven chapters reflect the costs of construction and installation works (CEW), the rest - other costs and additional costs associated with the production of work and the preparation of design estimates.
A summary estimate of the cost of building a road is compiled in accordance with Form 1.
To switch to 2014 prices, multiply the found estimated cost of pavement works by the index of change in the estimated cost of construction and installation works i c (i c =6,74) to FER-2001, recommended by the Ministry of Construction for the 4th quarter of 2014 (by type of construction “Other objects”).
Table 5. Form 1. Summary estimate calculation of the cost of construction of a highway of the categoryIb in Primorsky Krai
No. of estimates and calculations |
Name of chapters, works and costs |
Estimated cost, thousand rubles |
Share of chapters, % |
||||||||||
Equipment and its installation |
Other costs | ||||||||||||
Chapter I. Preparation of the construction site | |||||||||||||
Chapter II. earth bed | |||||||||||||
Chapter III. Artificial constructions | |||||||||||||
Estimate No. 1 |
Chapter IV. road clothes | ||||||||||||
Chapter V Communication Device | |||||||||||||
Chapter VI. Intersections and junctions | |||||||||||||
Chapter VII. Road devices and road conditions | |||||||||||||
Chapter VIII-XII. Limited and other costs | |||||||||||||
Total from I to XII chapters | |||||||||||||
Provision for unforeseen work and expenses | |||||||||||||
Total according to the consolidated estimate calculation (estimated cost) | |||||||||||||
The cost of 1 km of the road |
Students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.
Hosted at http://www.allbest.ru/
Introduction
Transport plays an important role in the development of social production and in increasing its efficiency. In our country, all modes of transport constitute a single transport system, in which an important role in terms of the share of goods and passengers belongs to road transport.
The efficiency of road transport largely depends on the development and technical condition of the road network. A well-maintained road network ensures the rational transportation of goods and passengers, the development of production forces in certain areas, reduces distribution costs, and creates conditions for saving production resources.
Road transport requires an extensive and technically well-maintained network of roads. For the construction and maintenance of this network in the plans of economic and social development of the Russian Federation provide significant resources (monetary, labor, material). They should be used most effectively to ensure the high quality of road construction and subsequent maintenance.
In the process of developing a term paper, the following tasks are set: to study the methodology for completing a term paper; deepen and expand knowledge of the discipline; gain experience of independent work with reference literature; to instill practical skills in carrying out cost estimates and the use in practice of modern methods of substantiation, evaluation and selection of optimal investment decisions.
Evaluation of construction products in a market economy is carried out by the investor (customer) concluding a contract for the construction or reconstruction of facilities, including the results of bidding (tenders).
To this end, in the process of developing pre-project or design and estimate documentation, investor estimates are compiled, which determine the free (contractual) price of objects under construction.
The contract price is determined for the construction site as a whole and includes: the estimated cost of construction and installation works; the cost of purchasing equipment, furniture, inventory; other costs related to the activities of the contractor; the cost of other works assumed by the contractor under the contract; a reserve of funds for unforeseen work and expenses in the amount established by agreement of the parties; costs associated with the formation of market relations and unaccounted for by state estimated norms and prices.
In the course work, to determine the contract price for the construction of a highway, it is proposed to use the basic index and resource methods. Thus, the contract price in construction consists of two parts: a basic price indicator calculated using the recommended state estimated norms and prices, and an additional indicator that takes into account the influence of market factors.
Given the specifics of road construction, in the course work it is proposed to draw up estimate documentation in the following composition:
Local estimate for the construction of the subgrade;
Local estimate for the installation of pavement;
Consolidated estimate calculation of the cost of construction of a / d. ;
Statement of the contractual price for the construction of a / d.
In addition, the following calculations are presented in the course work: calculation of transport costs for the transportation of building materials; calculation of the estimated cost of local materials; unit price for the preparation of a mixture for the top layer of the coating, which are necessary for the preparation local estimate for the pavement.
1 . Drawing up a local estimate for the construction of a subgrade
local estimates
An estimate is a document (part of a project) that determines the amount of money required for the construction of an object or the production of a certain type of work.
The cost of work, determined by local estimates, includes direct costs, overheads and estimated profit.
The basis for calculating the amount of work is the data of the individual task; road length (km) ; specific volume of earthworks per one kilometer of the route (thousand m3/km); the structure of earthworks by mechanization methods (%).
The thickness of the compacted soil layer is assumed to be 25 cm.
The area of the final leveling of the top and slopes of the road embankment is conventionally assumed to be equal to twice the total area of the roadbed.
The area of quarry planning, for the purpose of land reclamation, is taken on the basis of a conditional norm of 2000 m2/km of road.
The results of the calculation of the scope of work are shown in Table 1.
As a regulatory framework for the development of local estimates for earthworks is a collection of federal unit prices for earthworks /1/.
The estimated profit of road construction organizations is determined by the general industry standard in the amount of 65% of the wage fund for the main workers and workers - machine operators.
Table 1
Statement for calculating the volume of work on the construction of subgrade
Name of works |
unit of measurement |
The formula for calculating volumes |
Scope of work |
||
Removing the vegetation layer |
|||||
Excavation by escalator |
|||||
Cutting off the shortage of soil |
|||||
Transportation of soil by dump trucks |
1, 6*50, 45*1000 |
||||
Work on the dump for delivery |
|||||
Raising an embankment with a scraper |
|||||
Building an embankment with a bulldozer |
|||||
Soil compaction without watering |
|||||
The layout of the area of the top in a mechanized way |
15*2*11500/ (1000*100) *98 |
||||
The same manually |
15*2*11500/ (1000*100) *2 |
||||
Ground quarry planning |
2 . Drawing up a local estimate for the installation of pavement
The list of works on the arrangement of pavement is determined by the set of its structural layers, reflected on the transverse profile, fig.
When calculating the scope of work, it was taken into account that an additional layer is arranged over the entire width of the h. n. taking into account slopes, and the lower layer of the base is arranged with slopes (1: 1) (Table 2, 1). The overlying layers are arranged along the width of the carriageway.
GESH are used as a regulatory framework in the preparation of estimates; FSSCM; FSSCPG; FSTSESM.
Before starting to draw up an estimate, it is necessary to work out a scheme for the delivery of basic materials.
The estimated cost of road transportation is determined by the FSCCPG,. The cost of rail transportation is determined according to SSTSPG-91 with indexation to 2001 prices.
Determination of the estimated cost of materials is reduced to the calculation of the price of the ex-site warehouse of the construction site. The estimated price for the material consists of the selling price, margins of supply and marketing organizations, procurement and storage costs.
It is also necessary to draw up a unit price for the preparation of mixtures for the coating: the top layer - dense asphalt concrete m / z type A and the bottom - porous asphalt mix hot k / z.
Using the initial data, the results of the calculation of transport costs, as well as FSTSm. we make a calculation of the estimated price of materials in 2001 prices.
Figure 1. Cross section of the road Layers of pavement: 4 - cement concrete B30 - 220 mm, 3 - crushed stone laid according to the method - 180 mm, 2 - low-active slag - 150 mm, 1 - sand of medium size - 230 mm.
Table 2.1
Scope of work on pavement
Rationale |
Name |
Total quantity |
|||||
Labor costs |
|||||||
Labor costs of workers cf 2, 3 |
|||||||
Machinist labor tomorrows |
|||||||
Machines and mechanisms |
|||||||
Forklifts 5 t |
|||||||
Medium motor graders 99 (135) kW (hp) |
|||||||
Road rollers self-propelled on pneumatic wheels 30 t |
|||||||
Watering machines 6000 l |
|||||||
Rollers road self-propelled smooth 13 t |
|||||||
Fine stone distributors |
|||||||
Caterpillar tractors when working on other types of construction (except for water management) 79 (108) kW (hp) |
|||||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t |
|||||||
Concrete Paver Machines on Rail Forms Cement Concrete Finishing Machines |
|||||||
Concrete Paver Machines on Rail Forms Base Profiler |
|||||||
Concrete Paving Machines on Rail Forms Cement Concrete Distributor |
|||||||
Machines for applying film-forming materials |
|||||||
Tractor carts 20 t |
|||||||
Power plants mobile 2 kW |
|||||||
Surface vibrators |
|||||||
Cars onboard with a carrying capacity of up to 5 tons |
|||||||
Materials |
|||||||
Sand for construction work natural |
|||||||
Porous metallurgical slags: open-hearth and dump blast-furnace |
|||||||
Crushed slag blast-furnace and steelmaking for road construction class 1 fraction 10-20 mm |
|||||||
Crushed stone from natural stone for construction work, brand 1200, fraction 10-20 mm |
|||||||
Crushed stone from natural stone for construction work, brand 1200, fraction 40-70 mm |
|||||||
fittings |
|||||||
Road concrete (for the top layer and single-layer coatings) |
|||||||
Road concrete (for the bottom layer) |
|||||||
Film-forming materials for road works PM-100A |
|||||||
Separate structural elements of buildings and structures with a predominance of hot-rolled profiles, the average mass of an assembly unit is over 0.5 to 1 t |
|||||||
Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III |
|||||||
Softwood lumber. Edged boards 2-3.75 m long, 75-150 mm wide, 32-40 mm thick, grade III |
|||||||
Fuel oil |
|||||||
Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III |
|||||||
Birch and soft hardwood lumber: birch, linden. Edged boards 2-3, 75 m long, all widths, 25, 32, 40 mm thick, grade I |
|||||||
LOCAL RESOURCE ESTIMATE CALCULATION No. 2 |
||
(local estimates) |
||
construction of pavement for 11.5 km |
||
name of work and costs, name of the object) |
||
Base: drawings, diagrams |
||
Estimated cost, thousand rubles |
||
Compiled (a) at basic prices as of January 2000. |
CALCULATION 1 for the preparation of 1 t Preparation of heavy concrete on crushed stone class B30 with a material density of 2.5 t/m3
Justification of the price |
Naming of expenditures |
||||||
GESN 06-01-080-14 |
Preparation of heavy concrete on crushed stone class B30 with a material density of 2.5 t/m3 |
||||||
Labor costs of construction workers |
|||||||
Payroll calculation |
|||||||
Machinist labor costs |
|||||||
Mobile concrete mixers 250 l for other types of construction (except for water management) |
|||||||
Forklifts 5 t |
|||||||
materials |
|||||||
Portland slag cement for general construction and special purposes grade 500 |
|||||||
Sand for construction works natural |
|||||||
Crushed stone from natural stone for construction work |
|||||||
Calculation |
Delivery of the mixture to the track |
Calculation 1
Transportation of 1 ton of sand from the quarry to the track
Compiled in prices as of 01.01.2000
Initial data
1. Type of issued price FTSK
4. Automotive 2000
4, 2. Cargo class 1
4, 3. Discounts No
Calculation 2
Transportation costs per 1 ton of sand from quarries to asphalt plant
Initial data
1. Type of issued price FTSK
2. Name of suppliers Quarry
3. Mode of transport Automobile
4. Automotive 2000
4, 1. Type of vehicle Dump truck
4, 2. Cargo class 1
4, 3. Discounts No
4, 4. Explanatory factor 1. 0
Calculation 3
Transportation costs for 1 ton of crushed stone from the departure station to the asphalt plant
Initial data
1. Type of issued price FTSK
2. Name of suppliers of DKZ Smolensk
3. Mode of transport Road, rail
4. Automotive 2000
4, 1. Type of vehicle Open wagon
4, 2. Tariff scheme 1
4, 3. Discounts 0.5
4, 4. Wagon loading rate 1. 0
5. Road transport
5, 1. Type of vehicle Dump truck
5, 2. Cargo class 1
5, 3. Discounts No
5, 4. Explanatory factor 1. 0
the name of the operation |
Transportation distance |
Cost 1 t |
||||
Calculation formula |
||||||
Loading into and unloading wagons |
||||||
Rail transportation |
Smolensk- Bryansk |
|||||
Delivery of wagons for unloading |
Bryansk |
|||||
Loading and unloading operations for road transport at destinations |
Bryansk |
|||||
Bryansk - ABZ |
||||||
Explanatory correction factor. |
||||||
Total per 1 ton |
Calculation 4
Transportation costs per 1 ton of crushed stone from the quarry to the highway
Initial data
1. Type of issued price FTSK
2. Name of suppliers Quarry
3. Mode of transport Automobile
4. Automotive 2000
4, 1. Type of vehicle Dump truck
4, 2. Cargo class 1
4, 3. Discounts No
4, 4. Explanatory factor 1. 0
the name of the operation |
Name of final points of transportation |
Transportation distance |
Cost 1 t |
|||
Calculation formula |
||||||
Quarry, Bryansk |
||||||
Road transportation to destinations |
Quarry - track |
|||||
Total per 1 ton |
Calculation 5
Transportation costs per 1 ton of cement from the asphalt plant to the route
Initial data
1. Type of issued price FTSK
2. Name of suppliers Quarry
3. Mode of transport Automobile
4. Automotive 2000
4, 1. Type of vehicle Dump truck
4, 2. Cargo class 1
4, 3. Discounts No
4, 4. Explanatory factor 1. 0
the name of the operation |
Name of final points of transportation |
Transportation distance |
Cost 1 t |
|||
Calculation formula |
||||||
Loading and unloading operations in road transport for meat purposes |
Asphalt Plant, Bryansk |
|||||
Road transportation to destinations |
ABZ - track |
|||||
Explanatory correction factor |
||||||
Total per 1 ton |
Calculation 6
Transportation costs per 1 ton of black crushed stone from the asphalt plant to the route
Initial data
1. Type of issued price FTSK
2. Name of suppliers Quarry
3. Mode of transport Automobile
4. Automotive 2000
4, 1. Type of vehicle Dump truck
4, 2. Cargo class 1
4, 3. Discounts No
4, 4. Explanatory factor 1. 0
the name of the operation |
Name of final points of transportation |
Transportation distance |
Cost 1 t |
|||
Calculation formula |
||||||
Loading and unloading operations in road transport for meat purposes |
Asphalt Plant, Bryansk |
|||||
Road transportation to destinations |
ABZ - track |
|||||
Explanatory correction factor |
||||||
Total per 1 ton |
Calculation 7
Transportation costs per 1 ton of cement concrete from the asphalt plant to the route
Initial data
1. Type of issued price FTSK
2. Name of suppliers Quarry
3. Mode of transport Automobile
4. Automotive 2000
4, 1. Type of vehicle Dump truck
4, 2. Cargo class 1
4, 3. Discounts No
4, 4. Explanatory factor 1. 0
the name of the operation |
Name of final points of transportation |
Transportation distance |
Cost 1 t |
|||
Calculation formula |
||||||
Loading and unloading operations in road transport for meat purposes |
Asphalt Plant, Bryansk |
|||||
Road transportation to destinations |
ABZ - track |
|||||
Explanatory correction factor |
||||||
Total per 1 ton |
3 . Drawing up a consolidated estimate for the construction of a highway
In the consolidated cost estimate, the funds required for the construction of the road are systematized and presented by chapters, the numbers and names of which for each type of construction remain unchanged for transport construction objects. .
Each chapter reflects the costs of the objects related to it, according to the technological structure of investments: for construction and installation works, purchase of equipment, other costs.
In view of the fact that transport construction is characterized by features, the basis for compiling the SSRSS of roads is local rather than object estimates. In this regard, in the course work, the indicators for chapters 2 and 3 are filled in according to the final data compiled by local estimates for the construction of a subgrade and pavement.
In the course work, in accordance with the chosen base-index method for determining the cost of a highway, a summary estimate should be drawn up in the base price level of 2000.
The calculation of winter rises in prices and the norms are presented in Table 3. 2.
To determine the estimated cost of building a highway in modern prices, it is necessary to draw up a statement of the contract price (table 3. 3).
The initial data for these calculations are the positions of the individual task related to the consolidated estimate and the corresponding values of the aggregated indicators of the estimated cost of construction (UPSS).
Behind the result of the consolidated estimate, for reference, the value of the refundable amount (income) from the dismantling of temporary buildings and structures in the amount of 15% of their costs (Chapter 9) is indicated.
Table 3.1
Consolidated estimate calculation of the cost of construction of the highway Compiled in the prices of 2000 54546.87 thousand rubles.
Number of estimates and calculations |
Name of chapters, objects, works and costs |
Estimated cost, rub. |
Total Estimated Cost |
||||
Other expenses |
|||||||
Chapter 1. Preparation of the construction site |
|||||||
Registration of the right of way of the road 11. 5*1, 624=18, 68 |
|||||||
Registration of land acquisition for quarries, temporary roads 2, 4*5, 23=12, 55 |
|||||||
Restoration of the track of the 2nd technical category 5, 253*11, 5=60, 38 |
|||||||
Forest felling with stump removal 11500*40=46000m2= 46*0, 17=7, 82 ha 7, 82*11, 939=93, 36 |
|||||||
Compensation for losses to land users from land withdrawal: 46*0, 11= Under arable land: 5, 06 * 95, 19 = 481, 66 thousand rubles 5.06*167=845.02 thousand rubles |
845, 02-481, 66= |
||||||
Under grounds: 46*0, 16=7, 36 hectares 7, 36*27, 28=200, 78 |
647, 68-200, 78= |
||||||
Land reclamation 12, 55*282, 71=3548, 01 |
|||||||
Chapter 2 |
|||||||
Local estimate No. 1 |
Construction of the subgrade |
||||||
Strengthening works: Prefabricated concrete slabs 16 cm on a layer of crushed stone 20 cm |
Development of a local estimate for the construction of the subgrade, for preparatory work, for the installation of pavement, for artificial structures and for the improvement of the road. Calculation of the economic efficiency of the project from the reduction of construction time.
term paper, added 09/11/2014
The concept of estimated standards, their classification. Estimated construction cost. Calculation of indicators of the structure of estimated costs of the cost of work on the construction of subgrade and pavement, analysis of the data obtained. Contractual relations in construction.
term paper, added 12/07/2010
Natural conditions of the construction area. Designing a plan for the route of a highway, artificial structures, subgrade. Evaluation of solutions by the method of accident rates. Development of technology and organization of pavement construction.
term paper, added 10/07/2014
Features of road construction. Determining the scope of construction work for section No. 19 of the highway, choosing a method for organizing them. Construction of culverts, subgrade and pavement. Transport scheme of deliveries.
term paper, added 06/02/2012
Road and climatic conditions of the highway construction area. Pavement design. Technological sequence of construction of structural layers of pavement. Determination of the summary need for material resources.
term paper, added 05/24/2012
Constructing a diagram of traffic density and establishing the category of the road. Plan road design. Calculation of the volume of work on the filling of the subgrade and the installation of pipes. Determination of the estimated cost of road construction and road transport costs.
term paper, added 03/09/2016
Study of preparatory work in the construction of highways. Determining the amount of work to clear the road strip. Calculation of the need for machines, mechanisms, labor. Ground bed device. The laying of the upper layers of pavement.
practice report, added 09/21/2015
The design line of the longitudinal profile of the road. Construction of artificial structures. The construction of an earthen embankment. Technology of the device of metal corrugated pipes. Arrangement of the highway: markings, signs, signal posts.
thesis, added 04/13/2012
Characteristics of the area of construction and operation of the highway. Calculation of the need for machines and mechanisms for preparatory work. The device of reinforced concrete pipes and the construction of a subgrade. Creation of production schedule.
term paper, added 01/12/2011
Design of the reconstructed section of the highway. Technology of work on the construction of subgrade and layers of pavement. Requirements for labor protection, cost estimates, economic efficiency of reconstruction and methods of organizing work.
Students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.
Posted on http://www.allbest.ru/
Posted on http://www.allbest.ru/
Federal State Autonomous Educational Institution
Higher professional education
Siberian Federal University
Institute of Civil Engineering
Department "Automobile roads and urban structures"
INDEPENDENT WORK
By discipline: "Economics of road construction"
On the topic: "Drawing up a set of estimate documentation for the construction of a section of a highway"
Krasnoyarsk 2014
The following materials and products are required for the construction of a 2.1 km section of a motor road of the third technical category in the city of Krasnoyarsk: FMS for the installation of the lower base layer; FMS for the installation of the top layer of the base and for construction work on the device of the leveling layer of the base from sand; cold asphalt concrete mix type BX for the device of the top layer of the pavement; black crushed stone for the device of the lower layer of the coating; crushed stone for arranging pillows for pipe foundations; links of culvert single-point round reinforced concrete pipes with a hole of 2 m; caps for culverts.
For the device of the subgrade of the road, it is necessary to develop the soil with various types of machines: a bulldozer with a capacity of 330 kW; trailed scraper with a bucket with a capacity of 4.5 m 3; self-propelled scraper with a bucket with a capacity of 8 m 3; excavator with a bucket with a capacity of 1.6 m 3 with loading into dump trucks. In addition, it is necessary to transport soil over a distance of 12 km.
Unit costs are taken for the I territorial zone with reference to local conditions of building materials and reinforced concrete structures. Selling prices for quarry materials are accepted according to TSC 81-01? 2001. Selling prices for concrete and reinforced concrete products are adopted according to the price list TSC 81 - 01? 2001. In the cost calculation for reinforced concrete products, the cost of the props is taken into account. Loading and unloading operations are accepted according to TSC 81 - 01? 2001. Territorial collection of estimated prices for the transportation of goods for construction for the I zone of the Krasnoyarsk Territory. For the Krasnoyarsk Territory, we introduce a coefficient to the basic wages of serviced machine workers in the amount of 60%.
The estimate takes into account the following works and costs: temporary buildings and structures - 4.1%; funds for organizing contract tenders - 1.1%; funds for the fight against encephalitis tick - 0.3%; funds for voluntary insurance - 1%; the cost of transporting workers - 0.85%; additional costs in the performance of work in the winter - according to the calculation according to GSN 81 - 05? 02? 2001.; additional payment to employees of mobile construction organizations - 3.7%; length of service - 1%; snow fighting - 0.4%; additional costs for continuous work experience - 0.4%; travel expenses - 0.089%; the cost of doing work on a rotational basis - 1%; unforeseen work and expenses - 3%.; the content of the directorate of the enterprise under construction - 1.3%.
First of all, it is necessary to determine the off-road coefficient by the formula
where 20% is a seasonal increase in tariffs;
75% - the share of dirt roads in the total length of roads used for the transport of goods;
4 - the duration of the thaw, established by local authorities.
The total estimated cost is calculated by the formula
where PZ - direct costs;
HP - overhead;
SP - estimated profit.
Direct costs (PC) take into account the cost of production resources required to perform construction and installation works, calculated by the formula
PZ = ZP p. + EM + M,
where is the zp page? funds for the wages of builders and machinists;
EM? operation of machines, mechanisms, equipment;
M? materials, products, designs.
Overhead costs are a set of costs associated with the creation of the necessary conditions for the performance of work, as well as their organization, management and maintenance. Their value is determined by the indirect method as a percentage of the estimated labor costs for builders and machinists as part of the PZ according to MDS 81? 33.2004 according to the formula
It depends on the type of work, for the construction of roads it is equal to 142% of the salary of builders and machinists.
Estimated profit - funds intended to cover the costs of contracting subsidiaries for the development of production and material incentives for employees. It is the normative part of the cost of production and is calculated in accordance with MDS 81? 25.2001.
The basis for calculating the estimated profit is the amount of funds for the wages of builders and machinists as part of the estimated direct costs. The estimated profit is determined by the formula
estimate costing material construction
2. Calculations and estimates
Consolidated estimate calculation of the cost of construction of a section of the highway III. in the I zone of Krasnoyarsk
Estimates, calculations |
Name of chapters, works, costs |
Estimated cost, thousand rubles |
||||||
construction works |
installation work |
equipment and inventory |
other expenses |
total, thousand rubles |
||||
Chapter 2 |
||||||||
Earthbed from ordinary soils |
||||||||
Total for Ch. 2 |
||||||||
Chapter 3 |
||||||||
Cold mix asphalt pavement |
||||||||
Total for Ch. 3 |
||||||||
Total for Ch.1-8 |
||||||||
Total for Ch. 9 |
||||||||
Total for Ch. 1-9 |
||||||||
Total for Ch. 3 |
||||||||
Chapter 4 |
||||||||
The device of a single-point reinforced concrete round pipe with a diameter of 2x2 m |
||||||||
Total for Ch.1-8 |
||||||||
Chapter 9. Temporary buildings and structures |
||||||||
Temporary buildings and structures, 4.1% of the total data of Ch. 1-8 |
||||||||
Total for Ch. 9 |
||||||||
Total for Ch. 1-9 |
||||||||
Total for Ch.1-8 |
||||||||
Chapter 9. Temporary buildings and structures |
||||||||
Temporary buildings and structures, 4.1% of the total data of Ch. 1-8 |
||||||||
Total for Ch. 9 |
||||||||
Total for Ch. 1-9 |
||||||||
Chapter 10. Other work and costs |
||||||||
Additional costs for the winter rise in the cost of construction and installation works |
||||||||
Funds for organizing contract tenders, 0.1% |
||||||||
Encephalitis tick control costs, 0.3% |
||||||||
Funds for voluntary insurance, 1% (but not more than 3%) |
||||||||
The cost of transporting workers by road, 0.85% |
||||||||
Cost of remuneration for years of service, 1% |
||||||||
Costs associated with the mobile nature of work, 3.7% |
||||||||
Costs for continuous work experience, 0.4% |
||||||||
Employee travel expenses, 0.089% |
||||||||
Additional costs for snow removal, 0.4% |
||||||||
The cost of doing work on a rotational basis, 1% |
||||||||
Total for Ch. ten |
||||||||
Total for Ch. 1-10 |
||||||||
Customer service costs, 1.1% |
||||||||
Total for Ch. eleven |
||||||||
Total according to the consolidated estimate calculation (Ch. 1-12) |
||||||||
Reserve funds for unforeseen work and expenses, 3% |
||||||||
Total according to the consolidated estimate |
||||||||
Total SSR including VAT, 18% |
Object estimate of the cost of construction of a section of a motor road of the III category (1 zone, 1 district, Krasnoyarsk)
Number of chapter, calculation, document |
Name of works and costs |
Estimated cost, thousand rubles |
Labor intensity, thousand people-hours |
Estimated salary, thousand rubles |
unit cost |
||||||
construction works |
installation work |
equipment |
other works |
||||||||
earth bed |
|||||||||||
road clothes |
|||||||||||
Artificial constructions |
|||||||||||
Total for Ch.1-8 |
|||||||||||
Temporary buildings and structures, 4.1% |
|||||||||||
Normative labor intensity, 0.016 |
|||||||||||
Estimated salary, 19% |
|||||||||||
Total for Ch.1-9 |
|||||||||||
Other works and costs |
|||||||||||
Winter price increase |
|||||||||||
Normative labor intensity, 0.04 |
|||||||||||
Estimated salary, 40% |
|||||||||||
Total for Ch.1-10 |
|||||||||||
MDS81-35.2004 |
|||||||||||
Total: estimated cost |
|||||||||||
Estimated salary, 40% |
|||||||||||
Total for Ch.1-10 |
|||||||||||
MDS81-35.2004 |
Unforeseen costs and work, 1.5% |
Local estimate No. 1 for the construction of the subgrade of the section of the highway III, since in Krasnoyarsk
Name of works and costs |
Unit cost, rub. |
Total cost, rub. |
Labor intensity, person/h |
|||||||||
direct costs |
machine operation |
direct costs |
wages |
machine operation |
per unit |
|||||||
wages |
including wages |
including wages |
builders |
|||||||||
machinists |
||||||||||||
TER 01-01-032-08 |
Excavation of the 4th group by a bulldozer with a power of 330 kW with a movement of 30 m to the first: 10 |
|||||||||||
TER 01-01-032-16 K=3 |
for the next: 20 |
|||||||||||
TER 01- 01-01-023-04 |
Development of group II with a trailed scraper with a bucket of 4.5 m 3 and a displacement of 300 m |
|||||||||||
TER 01-01-01-023-16 K=10 |
for the next: 200 |
|||||||||||
TER 01-01-023-04 |
Development of group II with a trailed scraper with a bucket of 4.5 m 3 and a displacement of 500 m For the first 100 m |
|||||||||||
TER 01-01-032-16 K=40 |
for the following: |
|||||||||||
TER 01-01-023-04 |
Development of the I group of soil with a self-propelled scraper with a bucket of 8 m 3 and a displacement of 900 m for the first: 300 |
|||||||||||
TER 01-01-023-16 K=6 |
for the next: 600 |
|||||||||||
TER 01-01-023- |
Development of the I group of soil with a self-propelled scraper with a bucket of 8 m 3 and a displacement of 1100 m For the first 300 |
|||||||||||
TER 01-01-032-16 K=8 |
for the following: |
|||||||||||
TER 01-01-012-07 |
Development of the I group of soil by excavators with a bucket of 1.6 m 3 with loading onto dump trucks |
|||||||||||
TSC 81-01-2001 tab. eight |
Transportation of soil by dump trucks operating outside the quarry at a distance of 12 km |
|||||||||||
Total direct costs |
||||||||||||
Wage adjustment |
||||||||||||
MDS 81-33-2004 app. 4 p. 2 |
Overhead costs for mechanized earthworks, 95% of the salary of builders and machinists |
|||||||||||
Cost of construction and installation works |
||||||||||||
MDS 81-25.2001 app. 3 paragraph 21 |
Estimated profit for mechanized earthworks, 50% of the wages of builders and machinists |
|||||||||||
Estimated profit - the sum of cost and profit |
||||||||||||
Estimated salary |
Local estimate No. 2 for the installation of pavement for the section of the highway III, because in Krasnoyarsk
Code and position number of the standard |
Name of works and costs |
Unit cost, rub. |
Total cost, rub. |
Labor intensity, people / h. |
||||||||
direct costs |
machine operation |
direct costs |
wages |
machine operation |
per unit |
|||||||
wages |
including wages |
including wages |
builders |
|||||||||
machinists |
||||||||||||
TER 27-04-003-01 |
The device of the upper layer of the base with a thickness of 8 cm from PGS 60% |
|||||||||||
TER 27-04-003-01 K=16/12 |
The device of the upper layer of the base with a thickness of 16 cm from PGS 55% |
|||||||||||
Cost not included in the rate of ASG |
||||||||||||
TER 27-04-001-01 |
The device of a leveling layer 26 cm thick made of sand |
|||||||||||
The cost not included in the price of sand |
||||||||||||
TER 27-06-019-02 |
Installation of the top layer of the pavement with a thickness of 6 cm from cold asphalt concrete type BX |
|||||||||||
TER 27-04-003-01 K=(6-3)/0.5=6 |
For every 0.5 cm change in thickness add to EP 27-04-003-01 |
|||||||||||
TER 27-06-018-02 |
The device of the lower layer of the coating with a thickness of 9 cm of their black crushed stone of dense stone material 3t / m 3 and |
|||||||||||
Total direct costs |
||||||||||||
Wage adjustment |
||||||||||||
Wage Adjusted Direct Cost Totals |
||||||||||||
MDS 81-33-2004 app. 4 p. 21 |
Overhead costs for mechanized excavation, 142% of the salary of builders and machinists |
|||||||||||
Estimated wages of workers performing work that is considered overhead, 5.1% of overhead |
||||||||||||
Normative labor intensity of workers performing work accounted for by overhead costs, 0.0044 of overhead costs |
||||||||||||
Cost of construction and installation works |
||||||||||||
MDS 81-25.2001 appendix 3 point 21 |
Estimated profit for mechanized earthworks, 95% of the wages of builders and machinists |
|||||||||||
Normative labor intensity according to the estimate |
||||||||||||
Estimated salary |
Local estimate No. 3 for the installation of a culvert reinforced concrete round single-point pipe with a diameter of 2 m on the highway III, because in Krasnoyarsk
Code and position number of the standard |
Name of works and costs |
Unit cost, rub. |
Total cost, rub. |
Labor intensity, person/h |
|||||||
direct costs |
machine operation |
direct costs |
wages |
machine operation |
per unit |
||||||
wages |
including wages |
including wages |
builders |
||||||||
machinists |
|||||||||||
TER 30-01-001 |
The device of crushed stone pillows under the pipe |
||||||||||
TER 30-07-002-09 |
Laying pipe links |
||||||||||
TMC, Part IV (440-9006) |
Cost not included in the price of pipe links |
||||||||||
TER 30-07-014-06 |
Laying of pipe heads |
||||||||||
TMC, Part IV (440-9006) |
Cost not included in the price of pipe heads |
||||||||||
Total direct costs |
|||||||||||
Wage adjustment |
|||||||||||
Wage Adjusted Direct Cost Totals |
|||||||||||
MDS 81-33-2004 app. 4 p. 24 |
Overhead costs, 110% of the salary of builders and machinists |
||||||||||
Estimated wages of workers performing work that is considered overhead, 5.1% of overhead |
|||||||||||
Normative labor intensity of workers performing work accounted for by overhead costs, 0.0044 of overhead costs |
|||||||||||
Cost of construction and installation works |
|||||||||||
MDS 81-25.2001 app. 3 paragraph 24 |
Estimated profit, 80% of the wages of builders and machinists |
||||||||||
Estimated cost - the sum of cost and profit |
|||||||||||
Normative labor intensity according to the estimate |
|||||||||||
Estimated salary |
Calculation No. 1 of additional costs for the production of works in winter
Name of works |
Estimated cost, thousand rubles |
Norms of additional costs for winter appreciation in% of the estimated cost |
Justification of the norms of additional costs for the winter rise in the cost of work |
Estimated cost of the winter rise in the cost of work, thousand rubles. |
|
Ground bed device |
GSN 81-05-02-2001, sec. I, item 3.2 |
||||
Pavement device |
GSN 81-05-02-2001, sec. I, item 3.14 |
||||
Culvert laying |
GSN 81-05-02-2001, sec. I, item 3.17 |
||||
Construction of temporary buildings and structures, 4.1% |
|||||
Material costing
Name of materials |
Place of shipment |
Gross weight meas., t |
Transportation costs 1t., rub. |
Selling price, rub. |
Supply and sales margin, % |
The cost of containers, packaging, props, rub. |
Transportation costs, rub. |
Price "ex-site warehouse", rub. |
Procurement and storage costs, rub. |
Estimated cost, rub. |
|||||
Pipe links |
|||||||||||||||
pipe heads |
|||||||||||||||
0,6 273,19+0,4 235,53 |
|||||||||||||||
0,55 327,19+0,44 235,53 |
Calculation of the volume of work performed. Cross section of pavement. Local resource list of cooking in auxiliary production. Formation of a transport scheme for the delivery of building materials to the road. Transport cost estimates.
term paper, added 11/19/2015
Estimated cost of construction of the road pavement of the road of the II technical category, the length of the section is 19 km. Characteristics of the object under construction and the conditions for the supply of basic building materials. Determination of the amount of transport costs per 1 ton of products.
term paper, added 06/23/2016
The order, methods and forms of development of construction estimates and documentation. Characteristics of the basic, basic and current levels of the estimated cost. Calculation of the agreed (contract) price, number of workers, standard requirements for materials and profitability.
term paper, added 12/18/2011
Methods for calculating the estimated cost. Methodology for calculating construction and installation works. Determination of the estimated cost of building an object by the method of aggregated indicators. Local resource sheet. Local budget calculation of the base-index method.
term paper, added 12/15/2015
Pre-project research of the construction services market. Local estimate for civil works. Calculation of the number of workers and average monthly wages. Consolidated cost estimate for the construction of "Shopping Center". Calculation of the contract price.
term paper, added 03/29/2015
Preparation of estimate documentation using the basic-index method and its use in the activities of enterprises of the investment and construction complex. Calculation of the cost of material resources. Local and object cost estimates. Bill of quantities of work.
term paper, added 04/15/2014
Calculation of the amount of equipment and its load, the cost of fixed assets of the machining section, depreciation of fixed assets, the cost of basic materials for the manufacture of parts. Drawing up a cost estimate for the manufacture of the "Hull" part.
term paper, added 10/29/2015
The procedure for compiling local estimates. Types of technological equipment. Form of object estimate calculation. Consolidated estimate of the cost of construction. Resource, resource-index, basic-index and basic-compensation method.
test, added 01/24/2013
Organization of a discontinuous production line for the production site for the manufacture of printed circuit boards, drawing up a schedule for its work. Equipment layout and site area calculation. Drawing up an estimate of shop expenses; product costing.
thesis, added 01/12/2012
Summary table of electrical equipment of the site. Estimated cost of electrical equipment and its installation. Calculation of the staff of electricians of the site with a brigade form of labor organization. Additional costs for the operation of electrical equipment. Site performance indicators.